{"version":"1.1","enterprise":{"id":"northstar","name":"Northstar Equipment Services","asOf":"2026-05-06","scope":"Seven selected enterprise branches with explicit object boundaries. This is an authored hierarchy for the fictional case, not a complete enterprise map or a BIZBOK reference model. Original C-100–C-180 IDs remain stable; original decision labels are retained as aliases. The added parents, siblings, names, and levels are modeling additions, not evidence of approval in Decisions 1–3.","intro":"A fictional $780 million equipment-maintenance and rental company with 48 branches in twelve states and 3,200 employees. Its central question: can it make dependable service promises while protecting customer value and margin?"},"sources":{"CASE":{"label":"Earlier case · structural reference","version":"1.1","url":"/downloads/northstar-equipment-services-case-v1.1.md","locator":"Canonical backbone, capability boundaries, actors, organizational units, releases and change packages"},"HIERARCHY":{"label":"Corrected capability hierarchy · October 6, 2026","version":"1.1 modeling correction","url":"/cookbook/northstar/#capability-hierarchy","locator":"src/data/northstarHierarchy.json; authored hierarchy, not an approved case decision"},"A":{"label":"Decision 1 · E-001–E-007","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/episode-a/EVIDENCE-PACKET.md","locator":"January 9 investment evidence; authored fictional source extracts"},"B":{"label":"Decision 2 · E-008","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/episode-b/EVIDENCE-PACKET.md","locator":"January 30 readiness evidence and February 1 addendum"},"C":{"label":"Decision 3 · E-009–E-010","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/episode-c/EVIDENCE-PACKET.md","locator":"Day 30 and day 90 evidence; newly authored customer-value extension"},"DATA":{"label":"Decision 3 · calculation definitions and CSVs","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/episode-c/datasets/README.md","locator":"Explicit periods, scope bridge, original versus latest promises and restoration time"},"BRIEF-A":{"label":"Decision 1 reference brief (answer)","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/instructor/DECISION-BRIEF-A.md","locator":"Authored reference disposition; includes answers"},"BRIEF-B":{"label":"Decision 2 reference brief (answer)","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/instructor/DECISION-BRIEF-B.md","locator":"Authored reference disposition; includes answers"},"BRIEF-C":{"label":"Decision 3 reference brief (answer)","version":"1.2","url":"/downloads/scale-agent-kit-v0.6/case-study/instructor/DECISION-BRIEF-C.md","locator":"Authored reference disposition; includes answers"},"OBJECTS":{"label":"business object lifecycle pack · earlier workbook example","version":"1.1 archive","url":"/downloads/business-object-lifecycle-pack-v1.1.xlsx","locator":"Northstar worksheets; ratings are authored judgments, not measured maturity"},"CROSSMAP":{"label":"value stream capability cross map · earlier workbook example","version":"1.1 archive","url":"/downloads/value-stream-capability-cross-map-v1.1.xlsx","locator":"Northstar worksheets; ratings are authored judgments, not measured maturity"},"ASSESSMENT":{"label":"capability assessment heat map · earlier workbook example","version":"1.1 archive","url":"/downloads/capability-assessment-heat-map-v1.1.xlsx","locator":"Northstar worksheets; ratings are authored judgments, not measured maturity"},"STRATEGY":{"label":"strategy capability linkage · earlier workbook example","version":"1.1 archive","url":"/downloads/strategy-capability-linkage-v1.1.xlsx","locator":"Northstar worksheets; ratings are authored judgments, not measured maturity"},"ROADMAP":{"label":"initiative decomposition roadmap · earlier workbook example","version":"1.1 archive","url":"/downloads/initiative-decomposition-roadmap-v1.1.xlsx","locator":"Northstar worksheets; ratings are authored judgments, not measured maturity"},"CAPABILITIES":{"label":"capability definition validation pack · earlier workbook example","version":"1.1 archive","url":"/downloads/capability-definition-validation-pack-v1.1.xlsx","locator":"Northstar worksheets; ratings are authored judgments, not measured maturity"}},"concepts":{"objective":{"label":"Strategic objective","plural":"Strategy","mark":"◎","definition":"A business direction the enterprise intends to achieve.","question":"Which change would advance this objective?","limit":"An alignment link does not establish a financial return.","method":"/cookbook/#strategy-linkage","why":"It makes the intended direction explicit when Northstar compares competing uses of money and operating capacity.","decisions":"Check whether a proposed change addresses the objective, which outcomes matter, and what evidence would justify the next commitment."},"outcome":{"label":"Intended outcome","plural":"Outcomes","mark":"◇","definition":"A required change in the condition experienced by a stakeholder or the enterprise.","question":"What should become different, and for whom?","limit":"An intended outcome is not an observed result.","method":"/cookbook/#initiative-value-realization","why":"It separates the business condition Northstar wants from the activities or systems used to pursue it.","decisions":"Agree a measurable result and guardrails before claiming that a completed initiative delivered value."},"value-stream":{"label":"Value stream","plural":"Value streams","mark":"→","definition":"An end-to-end view of how a triggering stakeholder receives a value proposition, decomposed into value stream stages.","question":"Who triggers the stream, and what value do they seek?","limit":"A value stream is not a departmental process or a project plan.","method":"/cookbook/value-stream-capability-mapping/","why":"It follows the customer’s need across Northstar’s internal boundaries, so a finished task is not confused with restored equipment availability.","decisions":"Define the stakeholder, trigger, and value proposition first. Then test how stage value items collectively fulfill that proposition."},"stage":{"label":"Value stream stage","plural":"Value stream stages","mark":"→","definition":"An abstraction of value-creating activities and stakeholder interactions within a value stream. Each stage delivers one or more value items.","question":"What must be true when this stage is complete?","limit":"A stage has participating stakeholders and entry and exit criteria. Its value items contribute to the whole stream’s value proposition; completing a task alone does not establish value.","method":"/cookbook/value-stream-capability-mapping/","why":"It defines an increment of customer value and an exit condition that several Northstar abilities must jointly enable.","decisions":"Review whether the exit condition is met and which capability, information or accountability questions need investigation."},"capability":{"label":"Business capability","plural":"Capabilities","mark":"▦","definition":"An ability the enterprise needs, independent of the people, process, information, or technology used to perform it.","question":"What must Northstar be able to do?","limit":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","method":"/cookbook/business-capability-mapping/","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority."},"information":{"label":"Information concept","plural":"Information","mark":"◈","definition":"A business concept with an agreed identity, meaning, relationships, and lifecycle.","question":"Are different teams talking about the same thing?","limit":"A concept is distinct from a report, database field, or application record.","method":"/cookbook/#business-object-rationalization","why":"A shared concept keeps Northstar teams from making different promises with the same words or treating unlike records as interchangeable.","decisions":"Agree its identity, meaning, lifecycle and business ownership before comparing measures or automating a handoff."},"organization":{"label":"Organizational unit","plural":"Organization","mark":"▤","definition":"A defined organizational grouping that contributes to enterprise work.","question":"Which organizational boundaries must the change cross?","limit":"Organizational contribution does not transfer decision rights or create a capability parent.","method":"/cookbook/#organization-capability-value-map","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map."},"actor":{"label":"Stakeholder / authority","plural":"People & authority","mark":"○","definition":"A role or collective actor with interests, contributions, or defined decision rights.","question":"Who contributes, who is accountable, and who may decide?","limit":"Architecture stewardship does not confer investment or operating authority.","method":"/cookbook/#competing-capability-ownership","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation."},"initiative":{"label":"Initiative / option","plural":"Initiatives","mark":"↗","definition":"A bounded proposed or authorized change intended to improve business outcomes.","question":"Which capabilities and dependencies does this change touch?","limit":"A proposal, funding envelope, release, and procurement approval are separate commitments.","method":"/cookbook/business-architecture-impact-assessment/","why":"It gives a proposed business change a boundary that can be traced to affected abilities and strategic intent.","decisions":"Compare its scope, prerequisites and evidence needs with alternatives; obtain a separate cost/value case before committing."},"release":{"label":"Release","plural":"Releases","mark":"↗","definition":"A bounded increment of change with its own readiness and evidence conditions.","question":"What can this release safely establish?","limit":"Passing a feasibility gate does not authorize wider activation.","method":"/cookbook/#smallest-useful-release","why":"It bounds what Northstar proposes to learn or establish at one point in the change, preserving the conditions for a later commitment.","decisions":"Check operating entry, exit, continuation and stop conditions before approving activation or expansion."},"change-package":{"label":"Change package","plural":"Change packages","mark":"↗","definition":"A coherent part of an initiative with an outcome and dependencies.","question":"What must be ready before another change can work?","limit":"A package boundary is not a detailed delivery plan.","method":"/cookbook/#architecture-backed-initiative-decomposition","why":"It separates coherent work inside the initiative so that prerequisites and handoffs can be reviewed.","decisions":"Coordinate sequencing, ownership and readiness with related packages; an architectural dependency alone is not a delivery estimate."},"measure":{"label":"Business measure","plural":"Measures","mark":"∿","definition":"A defined observation with an explicit population, period, calculation, and decision use.","question":"What would count as progress, and what could the headline conceal?","limit":"Different populations and promise versions cannot be compared as if they were interchangeable.","method":"/cookbook/#initiative-value-realization","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline."},"policy":{"label":"Business policy","plural":"Policies","mark":"§","definition":"A governed rule with obligations, controls, and delegated authority.","question":"What decisions does the operating practice permit?","limit":"Policy approval does not establish adoption or sufficient operating capacity.","method":"/cookbook/#policy-regulatory-impact","why":"It makes permitted operating decisions explicit at the point Northstar forms or revises a customer commitment.","decisions":"Check whether people can follow the rule, route an exception and obtain timely authority under real operating constraints."},"technology":{"label":"Enabling record / technology","plural":"Technology","mark":"▣","definition":"A supporting system, record, or technical option described by the case.","question":"Can this implementation provide the business signal the capability needs?","limit":"A named source, available API, or vendor demonstration does not prove reliable business meaning or value.","method":"/cookbook/#technology-business-solution","why":"It shows where a business concept or signal is realized in an existing record or enabling technology. The implementation is distinct from the business meaning.","decisions":"Validate source status, freshness, lineage and failure handling before treating an integration as a reliable operating dependency."},"decision":{"label":"Governed decision","plural":"Decisions","mark":"◆","definition":"A recorded disposition by an authorized person or forum, with conditions and review triggers.","question":"What was actually authorized, and what remains open?","limit":"A later result does not rewrite what was knowable at the original decision.","method":"/cookbook/architecture-decision-record/","why":"It preserves what Northstar actually authorized, who held authority and which conditions remain attached.","decisions":"Determine the next permitted action and the evidence or separate authorization required before expanding the commitment."},"value-proposition":{"mark":"◇","method":"/cookbook/value-stream-capability-mapping/","label":"Value proposition","plural":"Value propositions","definition":"The overall value a triggering stakeholder seeks from a value stream. Stage value items accrue toward its fulfillment.","question":"What value must the triggering stakeholder actually receive?","why":"It keeps the end-to-end stakeholder promise visible when individual stages or internal metrics appear successful.","decisions":"Test whether the combined value delivered fulfills the stakeholder’s need.","limit":"A value proposition states desired value. A map, completed task, or improved measure does not establish that it has been fulfilled."},"value-item":{"mark":"◇","method":"/cookbook/value-stream-capability-mapping/","label":"Value item","plural":"Value items","definition":"An increment of value delivered by a value stream stage and observable by its participating stakeholders. It contributes to the stream’s value proposition.","question":"What value has this stage created or delivered?","why":"It connects an enabling capability’s contribution to something a stakeholder can recognize as valuable.","decisions":"Test the stage’s value item against its criteria and the stream’s overall proposition.","limit":"A value item is distinct from its stage, a task, an information record, and a KPI. Recovery evidence does not substitute for fulfilled customer value."}},"views":{"overview":{"title":"An enterprise is a set of connected promises.","subtitle":"Capabilities, Value Streams, Organization, and Information: four core domains connected around Northstar’s service-reliability challenge.","question":"What has to work together for a dependable customer promise?","infer":"The layers reveal where strategy relies on customer value, business abilities, shared meaning, and accountable decisions.","limit":"This is a decision-focused slice of Northstar, not a complete enterprise model. A connection is not causal proof.","use":"Select an element, inspect its evidence, then follow the relationship that could change the next decision."},"capabilities":{"title":"What Northstar must be able to do.","subtitle":"Seven documented hierarchy branches. Expand a branch to inspect its defined abilities.","question":"Where does a capability begin and end, and which changes depend on it?","infer":"Separate abilities can share information and enable the same value stage without becoming each other’s children.","limit":"Only L1 and L2 are documented. Added hierarchy context has no inherited assessment or executive approval. Workbook scores are earlier illustrative judgments, not current measured performance.","use":"Use the scope selector to highlight a value stream or initiative. Check boundaries and evidence before choosing a response."},"value":{"title":"One value stream. Stages that build its value.","subtitle":"Start with the triggering stakeholder and the value proposition. Then open the stages and trace the value items they deliver.","question":"How do the stage value items combine to fulfill the value proposition sought by the triggering stakeholder?","infer":"The stream contains stages. Capabilities enable those stages; participating stakeholders create or receive their value items. Those items accrue toward the whole proposition.","limit":"This is a value architecture, not a prescribed workflow or a numerical sum. Entry and exit criteria govern navigation; recovery may revisit stages without fulfilling the proposition.","use":"Select the stream, stakeholder, proposition, stage, or value item. Open a stage to inspect its criteria, participants, and enabling capabilities."},"strategy":{"title":"Make the investment argument traceable.","subtitle":"Objectives, intended outcomes, capabilities, initiatives, and measures remain separate.","question":"Which proposed changes credibly support the desired outcome?","infer":"Many-to-many links reveal shared dependencies and where a benefit claim needs stronger evidence.","limit":"A connected trace is a contribution argument, not a causal estimate or proof of ROI. Intended outcomes below are extracted modeling views of the existing objectives.","use":"Compare alternatives against the same outcome, test the missing evidence, and retain the decision authority."},"organization":{"title":"Connect the organization to the work and the value.","subtitle":"Explore organizational units, contributing roles, and their documented responsibilities.","question":"Who contributes to the capability, owns the information, and has authority to decide?","infer":"Organizational responsibilities connect across capabilities, value streams, and information; they are not a capability hierarchy.","limit":"This is a selected view of Northstar, not a complete organization chart. A connection does not imply authority beyond its documented assertion.","use":"Select a unit or role and follow its evidence-backed relationships before assigning accountability."},"information":{"title":"The same word can make two different promises.","subtitle":"Inspect conceptual meaning, supporting records, and organizational responsibility together.","question":"Who decides what a reservation means, and whether this source can be trusted?","infer":"A business-object owner, capability executive, and technology owner contribute different rights.","limit":"A source accepted for R1 is not automatically authoritative for the enterprise. The case does not establish a physical data model.","use":"Resolve meanings, states, lineage, and source conditions before selecting a report or automating a signal."},"impact":{"title":"Change the capability. Follow the consequences.","subtitle":"Choose a release, option, or change package to inspect its bounded footprint.","question":"What else must be considered if this change proceeds?","infer":"Direct changes are distinguished from adjacent dependencies; indirect footprints are labeled as inferred.","limit":"A dependency path identifies a question to investigate. It does not establish impact severity, cost, delivery effort, or approval.","use":"Bring the affected owners into scope and readiness discussions. Compare shared dependencies before treating two proposals as duplicates."},"relationships":{"title":"One connection at a time.","subtitle":"A focused, labeled relationship map with an equivalent text route for every connection.","question":"Why are these two architectural elements linked?","infer":"The label, direction, explanation, and provenance show the exact assertion being made.","limit":"Two-hop proximity is not transitive causation. “A uses B” and “B is owned by C” do not make C accountable for A.","use":"Follow a path, inspect its weakest assertion, and record the additional evidence the decision requires."}},"relationshipTypes":{"contains":{"label":"contains"},"enables":{"label":"enables"},"uses":{"label":"uses"},"manages":{"label":"manages"},"supports":{"label":"supports"},"requires":{"label":"requires"},"changes":{"label":"changes"},"supplies-signal-to":{"label":"supplies a signal to"},"accountable-to":{"label":"is accountable to"},"owned-by":{"label":"is owned by"},"contributes-to":{"label":"contributes to"},"depends-on":{"label":"depends on"},"measured-by":{"label":"is measured by"},"governed-by":{"label":"is governed by"},"represents":{"label":"represents"},"authorizes":{"label":"authorizes within conditions"},"constrains":{"label":"constrains"},"association":{"label":"is associated with"},"existence-dependency":{"label":"depends for its existence on"},"triggers":{"label":"triggers"},"desires":{"label":"desires"},"delivers":{"label":"delivers"},"accrues-to":{"label":"accrues toward"},"participates-in":{"label":"participates in"}},"elements":[{"provenance":"established","description":"Customers receive commitments that can be kept, changed transparently, or escalated through a usable exception route","why":"It makes the intended direction explicit when Northstar compares competing uses of money and operating capacity.","decisions":"Check whether a proposed change addresses the objective, which outcomes matter, and what evidence would justify the next commitment.","risks":"A common policy must not prevent branches from responding to legitimate local conditions","facts":[],"sources":["CASE"],"id":"O-01","type":"objective","name":"Improve service-promise reliability while preserving appropriate branch operating discretion","definition":"Improve service-promise reliability while preserving appropriate branch operating discretion"},{"provenance":"modeling","description":"Intended outcome extracted from the existing objective table. The Atlas identifier is a modeling extension; this is not a new outcome claim.","why":"It separates the business condition Northstar wants from the activities or systems used to pursue it.","decisions":"Agree a measurable result and guardrails before claiming that a completed initiative delivered value.","risks":"A common policy must not prevent branches from responding to legitimate local conditions","facts":[],"sources":["CASE"],"id":"OUT-01","type":"outcome","name":"Dependable customer commitments","definition":"Customers receive commitments that can be kept, changed transparently, or escalated through a usable exception route"},{"provenance":"established","description":"Reliability improves without transferring hidden cost or capacity burden to branches, technicians, or adjacent work","why":"It makes the intended direction explicit when Northstar compares competing uses of money and operating capacity.","decisions":"Check whether a proposed change addresses the objective, which outcomes matter, and what evidence would justify the next commitment.","risks":"Margin, technician productivity, implementation cost, and capacity remain visible","facts":[],"sources":["CASE"],"id":"O-02","type":"objective","name":"Protect service margin","definition":"Protect service margin"},{"provenance":"modeling","description":"Intended outcome extracted from the existing objective table. The Atlas identifier is a modeling extension; this is not a new outcome claim.","why":"It separates the business condition Northstar wants from the activities or systems used to pursue it.","decisions":"Agree a measurable result and guardrails before claiming that a completed initiative delivered value.","risks":"Margin, technician productivity, implementation cost, and capacity remain visible","facts":[],"sources":["CASE"],"id":"OUT-02","type":"outcome","name":"Margin without hidden burden","definition":"Reliability improves without transferring hidden cost or capacity burden to branches, technicians, or adjacent work"},{"provenance":"established","description":"Fewer customers experience preventable return visits, missed commitments, and recoverable escalations","why":"It makes the intended direction explicit when Northstar compares competing uses of money and operating capacity.","decisions":"Check whether a proposed change addresses the objective, which outcomes matter, and what evidence would justify the next commitment.","risks":"Cause coding, customer escalation, and branch-level variation remain visible","facts":[],"sources":["CASE"],"id":"O-03","type":"objective","name":"Reduce avoidable customer disruption and repeat work","definition":"Reduce avoidable customer disruption and repeat work"},{"provenance":"modeling","description":"Intended outcome extracted from the existing objective table. The Atlas identifier is a modeling extension; this is not a new outcome claim.","why":"It separates the business condition Northstar wants from the activities or systems used to pursue it.","decisions":"Agree a measurable result and guardrails before claiming that a completed initiative delivered value.","risks":"Cause coding, customer escalation, and branch-level variation remain visible","facts":[],"sources":["CASE"],"id":"OUT-03","type":"outcome","name":"Less disruption and repeat work","definition":"Fewer customers experience preventable return visits, missed commitments, and recoverable escalations"},{"provenance":"established","description":"The whole stream begins when the customer operations manager requests help for equipment that is unavailable or at risk. Its five stages contribute value toward restored usable availability confirmed by that customer.","why":"It follows the customer’s need across Northstar’s internal boundaries, so a finished task is not confused with restored equipment availability.","decisions":"Define the stakeholder, trigger, and value proposition first. Then test how stage value items collectively fulfill that proposition.","risks":"A value stream is not a departmental process or a project plan.","facts":[{"label":"Triggering need","value":"Equipment is unavailable or at risk, prompting the customer operations manager to request service."},{"label":"Fulfillment","value":"Restored availability and customer acceptance are evidenced and reconciled to the agreed service commitment."}],"sources":["CASE","A"],"id":"VS-01","type":"value-stream","name":"Restore Equipment Availability","definition":"Restore usable equipment availability for the customer operations manager."},{"provenance":"modeling","description":"The desired value of VS-01, expressed from the triggering stakeholder’s perspective. The stage value items collectively contribute to it; recovery or termination without fulfillment does not deliver it.","why":"It keeps the end-to-end stakeholder promise visible when individual stages or internal metrics appear successful.","decisions":"Test whether the combined value delivered fulfills the stakeholder’s need.","risks":"A value proposition states desired value. A map, completed task, or improved measure does not establish that it has been fulfilled.","facts":[],"sources":["CASE","CROSSMAP"],"id":"VP-01","type":"value-proposition","name":"Customer-confirmed restored equipment availability","definition":"Usable equipment availability restored for the customer operations manager and confirmed against the agreed service commitment."},{"provenance":"established","description":"An accepted, actionable need","why":"It defines an increment of customer value and an exit condition that several Northstar abilities must jointly enable.","decisions":"Review whether the exit condition is met and which capability, information or accountability questions need investigation.","risks":"A stage has participating stakeholders and entry and exit criteria. Its value items contribute to the whole stream’s value proposition; completing a task alone does not establish value.","facts":[{"label":"Entering","value":"Equipment problem is emerging or known"},{"label":"Exiting","value":"A valid service need is accepted and classified"},{"label":"Entry criterion","value":"Equipment problem or risk is known"},{"label":"Exit criterion","value":"Asset, urgency, requester authority, location, and contact data are valid"},{"label":"Participating stakeholders","value":"ORG-01 Customer operations manager; ORG-03 Dispatcher"}],"sources":["CROSSMAP","CASE"],"id":"ST-01","type":"stage","name":"Identify need","definition":"Recognize and qualify the customer’s equipment-service need so it can receive an accountable response.","parentId":"VS-01","order":1},{"provenance":"modeling","description":"The value-item entry from Identify need. It accrues toward the stream’s value proposition when the applicable fulfillment conditions hold. Recovery evidence keeps the remaining obligation visible.","why":"It connects an enabling capability’s contribution to something a stakeholder can recognize as valuable.","decisions":"Test the stage’s value item against its criteria and the stream’s overall proposition.","risks":"A value item is distinct from its stage, a task, an information record, and a KPI. Recovery evidence does not substitute for fulfilled customer value.","facts":[],"sources":["CROSSMAP","CASE"],"id":"VI-01","type":"value-item","name":"An accepted, actionable need","definition":"An accepted, actionable need","parentId":"ST-01"},{"provenance":"established","description":"A credible commitment accepted by the customer","why":"It defines an increment of customer value and an exit condition that several Northstar abilities must jointly enable.","decisions":"Review whether the exit condition is met and which capability, information or accountability questions need investigation.","risks":"A stage has participating stakeholders and entry and exit criteria. Its value items contribute to the whole stream’s value proposition; completing a task alone does not establish value.","facts":[{"label":"Entering","value":"Need is accepted but timing is uncertain"},{"label":"Exiting","value":"A feasible commitment is understood and accepted"},{"label":"Entry criterion","value":"A valid service need is accepted and classified"},{"label":"Exit criterion","value":"Promise reflects POL-01, skill, part, geography, capacity, and any approved exception"},{"label":"Participating stakeholders","value":"ORG-01 Customer operations manager; ORG-03 Dispatcher; parts and scheduling contributors; ORG-02 / ORG-05 for exceptions"}],"sources":["CROSSMAP","CASE"],"id":"ST-02","type":"stage","name":"Define service promise","definition":"Establish and communicate a feasible commitment using the service need, resource signals, and applicable policy.","parentId":"VS-01","order":2},{"provenance":"modeling","description":"The value-item entry from Define service promise. It accrues toward the stream’s value proposition when the applicable fulfillment conditions hold. Recovery evidence keeps the remaining obligation visible.","why":"It connects an enabling capability’s contribution to something a stakeholder can recognize as valuable.","decisions":"Test the stage’s value item against its criteria and the stream’s overall proposition.","risks":"A value item is distinct from its stage, a task, an information record, and a KPI. Recovery evidence does not substitute for fulfilled customer value.","facts":[],"sources":["CROSSMAP","CASE"],"id":"VI-02","type":"value-item","name":"A credible commitment accepted by the customer","definition":"A credible commitment accepted by the customer","parentId":"ST-02"},{"provenance":"established","description":"Service ready to execute","why":"It defines an increment of customer value and an exit condition that several Northstar abilities must jointly enable.","decisions":"Review whether the exit condition is met and which capability, information or accountability questions need investigation.","risks":"A stage has participating stakeholders and entry and exit criteria. Its value items contribute to the whole stream’s value proposition; completing a task alone does not establish value.","facts":[{"label":"Entering","value":"Commitment exists but work is not ready"},{"label":"Exiting","value":"Work is ready to execute"},{"label":"Entry criterion","value":"A governed customer promise exists"},{"label":"Exit criterion","value":"Work order, technician assignment, required reservation, and access conditions are confirmed"},{"label":"Participating stakeholders","value":"ORG-03 Dispatcher; ORG-04 Field technician; parts contributors; ORG-01 for site access"}],"sources":["CROSSMAP","CASE"],"id":"ST-03","type":"stage","name":"Prepare service","definition":"Coordinate prerequisites and resource confirmations so the promised service can proceed.","parentId":"VS-01","order":3},{"provenance":"modeling","description":"The value-item entry from Prepare service. It accrues toward the stream’s value proposition when the applicable fulfillment conditions hold. Recovery evidence keeps the remaining obligation visible.","why":"It connects an enabling capability’s contribution to something a stakeholder can recognize as valuable.","decisions":"Test the stage’s value item against its criteria and the stream’s overall proposition.","risks":"A value item is distinct from its stage, a task, an information record, and a KPI. Recovery evidence does not substitute for fulfilled customer value.","facts":[],"sources":["CROSSMAP","CASE"],"id":"VI-03","type":"value-item","name":"Service ready to execute","definition":"Service ready to execute","parentId":"ST-03"},{"provenance":"established","description":"Restored equipment condition, or explicit evidence that further recovery is required","why":"It defines an increment of customer value and an exit condition that several Northstar abilities must jointly enable.","decisions":"Review whether the exit condition is met and which capability, information or accountability questions need investigation.","risks":"A stage has participating stakeholders and entry and exit criteria. Its value items contribute to the whole stream’s value proposition; completing a task alone does not establish value.","facts":[{"label":"Entering","value":"Work is ready"},{"label":"Exiting","value":"Equipment condition is restored or otherwise dispositioned"},{"label":"Entry criterion","value":"Work package is ready"},{"label":"Exit criterion","value":"Work outcome, consumption, and exceptions are recorded"},{"label":"Participating stakeholders","value":"ORG-04 Field technician; ORG-01 Customer operations manager"}],"sources":["CROSSMAP","CASE"],"id":"ST-04","type":"stage","name":"Perform service","definition":"Carry out the authorized intervention and establish its equipment-condition result and any remaining exceptions.","parentId":"VS-01","order":4},{"provenance":"modeling","description":"The value-item entry from Perform service. It accrues toward the stream’s value proposition when the applicable fulfillment conditions hold. Recovery evidence keeps the remaining obligation visible.","why":"It connects an enabling capability’s contribution to something a stakeholder can recognize as valuable.","decisions":"Test the stage’s value item against its criteria and the stream’s overall proposition.","risks":"A value item is distinct from its stage, a task, an information record, and a KPI. Recovery evidence does not substitute for fulfilled customer value.","facts":[],"sources":["CROSSMAP","CASE"],"id":"VI-04","type":"value-item","name":"Restored equipment condition, or explicit evidence that further recovery is required","definition":"Restored equipment condition, or explicit evidence that further recovery is required","parentId":"ST-04"},{"provenance":"established","description":"Confirmed restored availability on success; a documented outstanding obligation or unfulfilled termination otherwise","why":"It defines an increment of customer value and an exit condition that several Northstar abilities must jointly enable.","decisions":"Review whether the exit condition is met and which capability, information or accountability questions need investigation.","risks":"A stage has participating stakeholders and entry and exit criteria. Its value items contribute to the whole stream’s value proposition; completing a task alone does not establish value.","facts":[{"label":"Entering","value":"Service occurred but value is unconfirmed"},{"label":"Exiting","value":"Equipment availability is restored and the customer confirms the agreed outcome"},{"label":"Entry criterion","value":"A recorded work outcome exists"},{"label":"Exit criterion","value":"Success: restored availability and customer acceptance are evidenced and reconciled to the promise. Recovery: reenter the relevant stages with an open value obligation. If restoration cannot be achieved, record termination without fulfillment and resulting obligations"},{"label":"Participating stakeholders","value":"ORG-01 Customer operations manager; customer-recovery contributors; ORG-04 for work-outcome evidence"}],"sources":["CROSSMAP","CASE"],"id":"ST-05","type":"stage","name":"Confirm outcome","definition":"Verify the customer’s receipt of restored availability, reconcile it to the commitment, and determine success, further recovery, or termination without fulfillment.","parentId":"VS-01","order":5},{"provenance":"modeling","description":"The value-item entry from Confirm outcome. It accrues toward the stream’s value proposition when the applicable fulfillment conditions hold. Recovery evidence keeps the remaining obligation visible.","why":"It connects an enabling capability’s contribution to something a stakeholder can recognize as valuable.","decisions":"Test the stage’s value item against its criteria and the stream’s overall proposition.","risks":"A value item is distinct from its stage, a task, an information record, and a KPI. Recovery evidence does not substitute for fulfilled customer value.","facts":[],"sources":["CROSSMAP","CASE"],"id":"VI-05","type":"value-item","name":"Confirmed restored availability on success; a documented outstanding obligation or unfulfilled termination otherwise","definition":"Confirmed restored availability on success; a documented outstanding obligation or unfulfilled termination otherwise","parentId":"ST-05"},{"provenance":"modeling","description":"Establish and maintain a recognized equipment-service need, then govern its disposition against the requested customer outcome.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Service Request (BO-01)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-010","type":"capability","name":"Service Request Management","definition":"Establish and maintain a recognized equipment-service need, then govern its disposition against the requested customer outcome.","parentId":null,"level":1,"alias":""},{"provenance":"established","description":"Identify, accept, qualify, and maintain a service need; exclude the customer commitment and authorization of work.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Service Request (BO-01)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-100","type":"capability","name":"Service Request Qualification","definition":"Identify, accept, qualify, and maintain a service need; exclude the customer commitment and authorization of work.","parentId":"C-010","level":2,"alias":"Customer Need Management"},{"provenance":"established","description":"Northstar must establish that the equipment is usable and the customer confirms the outcome. A recovery handoff leaves the value obligation open.","why":"Closing a work order is not the same as restoring customer value.","decisions":"Investigate original-promise fulfillment and restoration time before expanding the practice.","risks":"Success can be overstated if revised commitments replace the original customer need.","facts":[{"label":"Focal object","value":"Service Request (BO-01)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-160","type":"capability","name":"Service Request Resolution","definition":"Reconcile the request, promise, and work result; confirm restored availability and customer acceptance, retain open recovery obligations, or record termination without fulfillment.","parentId":"C-010","level":2,"alias":"Service Outcome Management","target":"Archived v1.1 proposed rating: 4 → 5. These are authored judgments, not measured maturity or v1.2 achieved results."},{"provenance":"established","description":"The customer commitment is the center of this case. Dispatchers need dependable part, skill, geography, and capacity signals before confirming a date, or a usable approved exception.","why":"A better scheduling screen cannot make an infeasible promise reliable.","decisions":"Choose what to investigate before procurement; define promise rules and readiness conditions.","risks":"Premature commitments, incompatible regional definitions, and difficult exception routes. Later promises may improve adherence while delaying restoration.","facts":[{"label":"Focal object","value":"Customer Promise (BO-02)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-110","type":"capability","name":"Customer Promise Management","definition":"Establish, validate, communicate, monitor, and revise a governed customer commitment; use resource evidence without planning work or owning resource allocations or final customer-value acceptance.","parentId":null,"level":1,"alias":"Service Promise Management","condition":"Policy, information, and authority constraints documented; relative causal contribution unresolved.","target":"R1 confirmation or a complete approved exception, with original-promise lineage and customer-value monitoring.","assessment":{"band":"high","importance":5,"performance":2,"strength":0.9,"summary":"E-001, E-003: 82% adherence plus five branch workshops","limitation":"Regional definition differences","source":"ASSESSMENT","status":"Illustrative v1.1 Decision 1 judgment"}},{"provenance":"modeling","description":"Specify the proposed commitment, its scope, timing, and terms.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Customer Promise (BO-02)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-111","type":"capability","name":"Customer Promise Definition","definition":"Specify the proposed commitment, its scope, timing, and terms.","parentId":"C-110","level":2,"alias":""},{"provenance":"modeling","description":"Assess the proposed commitment against policy and the available feasibility evidence.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Customer Promise (BO-02)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-112","type":"capability","name":"Customer Promise Validation","definition":"Assess the proposed commitment against policy and the available feasibility evidence.","parentId":"C-110","level":2,"alias":""},{"provenance":"modeling","description":"Communicate the commitment and its status to the parties who rely on it.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Customer Promise (BO-02)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-113","type":"capability","name":"Customer Promise Communication","definition":"Communicate the commitment and its status to the parties who rely on it.","parentId":"C-110","level":2,"alias":""},{"provenance":"modeling","description":"Determine the commitment’s current standing and whether its terms are being met.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Customer Promise (BO-02)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-114","type":"capability","name":"Customer Promise Monitoring","definition":"Determine the commitment’s current standing and whether its terms are being met.","parentId":"C-110","level":2,"alias":""},{"provenance":"modeling","description":"Revise, cancel, or supersede the commitment while retaining its history and obligations.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Customer Promise (BO-02)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-115","type":"capability","name":"Customer Promise Change","definition":"Revise, cancel, or supersede the commitment while retaining its history and obligations.","parentId":"C-110","level":2,"alias":""},{"provenance":"modeling","description":"Specify and authorize a unit of service work, perform and record it, then reconcile and close its work record; exclude customer-value acceptance and resource ownership.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Work Order (BO-03)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-030","type":"capability","name":"Work Order Management","definition":"Specify and authorize a unit of service work, perform and record it, then reconcile and close its work record; exclude customer-value acceptance and resource ownership.","parentId":null,"level":1,"alias":""},{"provenance":"established","description":"Translate an accepted need into authorized work scope, method, and prerequisites; exclude capacity assignment and execution.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Work Order (BO-03)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-120","type":"capability","name":"Work Order Planning","definition":"Translate an accepted need into authorized work scope, method, and prerequisites; exclude capacity assignment and execution.","parentId":"C-030","level":2,"alias":"Work Planning"},{"provenance":"established","description":"Perform and record the authorized equipment intervention and its exceptions; exclude customer acceptance and promise policy.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Work Order (BO-03)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-150","type":"capability","name":"Work Order Execution","definition":"Perform and record the authorized equipment intervention and its exceptions; exclude customer acceptance and promise policy.","parentId":"C-030","level":2,"alias":"Field Service Execution","target":"Archived v1.1 proposed rating: 4 → 4. These are authored judgments, not measured maturity or v1.2 achieved results.","assessment":{"band":"low","importance":5,"performance":4,"strength":0.85,"summary":"E-002, E-005: repeat-work sample and margin evidence","limitation":"M-02 sample/cause coding disputed; M-03 margin evidence governed.","source":"ASSESSMENT","status":"Illustrative v1.1 Decision 1 judgment"}},{"provenance":"modeling","description":"Reconcile recorded work, consumption, and exceptions and determine administrative closure or cancellation; closure alone does not prove delivered customer value.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Work Order (BO-03)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-151","type":"capability","name":"Work Order Closure","definition":"Reconcile recorded work, consumption, and exceptions and determine administrative closure or cancellation; closure alone does not prove delivered customer value.","parentId":"C-030","level":2,"alias":""},{"provenance":"modeling","description":"Govern the identity and engagement of people whose work the enterprise uses, their qualifications and availability, and their assignment to demand; cross-map agreements, payments, and organizational units.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Human Resource"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-040","type":"capability","name":"Human Resource Management","definition":"Govern the identity and engagement of people whose work the enterprise uses, their qualifications and availability, and their assignment to demand; cross-map agreements, payments, and organizational units.","parentId":null,"level":1,"alias":""},{"provenance":"modeling","description":"Establish and maintain a person’s working relationship with the enterprise, including entry, changes, and exit.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Human Resource"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-131","type":"capability","name":"Human Resource Engagement","definition":"Establish and maintain a person’s working relationship with the enterprise, including entry, changes, and exit.","parentId":"C-040","level":2,"alias":""},{"provenance":"modeling","description":"Establish and maintain the evidence of a person’s skills and qualifications.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Human Resource"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-132","type":"capability","name":"Human Resource Qualification","definition":"Establish and maintain the evidence of a person’s skills and qualifications.","parentId":"C-040","level":2,"alias":""},{"provenance":"modeling","description":"Determine the person’s available time, location, and capacity constraints.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Human Resource"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-133","type":"capability","name":"Human Resource Availability","definition":"Determine the person’s available time, location, and capacity constraints.","parentId":"C-040","level":2,"alias":""},{"provenance":"established","description":"Qualified people, time, geography, and capacity must line up. The rural branch has limited skill substitution and long travel.","why":"Part availability alone cannot establish a feasible service date.","decisions":"Test regional exception capacity and rural scenarios before broader activation.","risks":"The compact SCALE workspace assigns a coordination owner to ORG-05. The detailed capability register assigns performance accountability to ORG-07. This Atlas keeps ORG-07 accountable and maps ORG-05 as a regional contributor.","facts":[{"label":"Focal object","value":"Human Resource"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-130","type":"capability","name":"Human Resource Scheduling","definition":"Match authorized demand to qualified people, time, geography, and capacity; govern the resulting assignments without owning parts or customer commitments.","parentId":"C-040","level":2,"alias":"Resource Scheduling","condition":"Rural constraints and exception latency remain at day 90.","target":"Archived v1.1 proposed rating: 3 → 4. These are authored judgments, not measured maturity or v1.2 achieved results.","assessment":{"band":"medium","importance":4,"performance":3,"strength":0.75,"summary":"E-003, E-007: workshops plus planning evidence for skill, travel, and capacity variation","limitation":"Skill-data quality not quantified","source":"ASSESSMENT","status":"Illustrative v1.1 Decision 1 judgment"}},{"provenance":"modeling","description":"Define and acquire physical components used in equipment service, govern their availability and use, and retire unusable or obsolete components; cross-map suppliers, payments, and equipment assets.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Part"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-050","type":"capability","name":"Part Management","definition":"Define and acquire physical components used in equipment service, govern their availability and use, and retire unusable or obsolete components; cross-map suppliers, payments, and equipment assets.","parentId":null,"level":1,"alias":""},{"provenance":"modeling","description":"Establish and maintain the identity, specification, and permitted use of a physical service component.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Part"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-141","type":"capability","name":"Part Definition","definition":"Establish and maintain the identity, specification, and permitted use of a physical service component.","parentId":"C-050","level":2,"alias":""},{"provenance":"modeling","description":"Obtain and accept components that satisfy the defined service need.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Part"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-142","type":"capability","name":"Part Acquisition","definition":"Obtain and accept components that satisfy the defined service need.","parentId":"C-050","level":2,"alias":""},{"provenance":"established","description":"“Allocated” did not consistently mean a confirmed reservation. ORG-08 owns BO-05; its inventory source is only provisional for R1.","why":"Automating an ambiguous status can make an unreliable signal arrive faster.","decisions":"Resolve source semantics and reconciliation before deciding whether targeted integration is sufficient.","risks":"Enterprise source authority remains open under OI-06; manual controls require recurring capacity.","facts":[{"label":"Focal object","value":"Part"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-140","type":"capability","name":"Part Availability Management","definition":"Determine, reserve, position, consume, release, and expire availability of service components; exclude technician assignments and customer commitments.","parentId":"C-050","level":2,"alias":"Parts Availability Management","condition":"R1 accepted with twice-daily reconciliation; enterprise source authority unresolved.","target":"Archived v1.1 proposed rating: 2 → 4. These are authored judgments, not measured maturity or v1.2 achieved results.","assessment":{"band":"high","importance":5,"performance":2,"strength":0.8,"summary":"E-003: workshops; proposed BO-05 owner and candidate source remain unconfirmed in Decision 1","limitation":"Authoritative source unresolved","source":"ASSESSMENT","status":"Illustrative v1.1 Decision 1 judgment"}},{"provenance":"modeling","description":"Determine and govern withdrawal or disposal of unusable or obsolete components.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Part"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-143","type":"capability","name":"Part Retirement","definition":"Determine and govern withdrawal or disposal of unusable or obsolete components.","parentId":"C-050","level":2,"alias":""},{"provenance":"established","description":"Measures preserve the version of the promise, population, period, scope changes, and financial guardrails.","why":"Leaders can make an apparently evidence-based decision using incomparable numbers.","decisions":"Separate the 95% strategic target, the 92% R1 feasibility gate, and observed results.","risks":"Later-period confirmation and policy compliance are not cumulative measures; they are not nested sets.","facts":[{"label":"Focal object","value":"Performance Measure (M-* register)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-170","type":"capability","name":"Performance Measure Management","definition":"Define business measures and guardrail thresholds, determine their observed values, and interpret and govern their use; exclude source transactions and operational remediation.","parentId":null,"level":1,"alias":"Service Performance Management","target":"Archived v1.1 proposed rating: 2 → 4. These are authored judgments, not measured maturity or v1.2 achieved results.","assessment":{"band":"high","importance":4,"performance":2,"strength":0.7,"summary":"E-001, E-002: existing reports with inconsistent definitions","limitation":"Two regions dispute repeat-visit measure","source":"ASSESSMENT","status":"Illustrative v1.1 Decision 1 judgment"}},{"provenance":"modeling","description":"Specify a measure’s meaning, calculation, population, period, and guardrail thresholds.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Performance Measure (M-* register)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-171","type":"capability","name":"Performance Measure Definition","definition":"Specify a measure’s meaning, calculation, population, period, and guardrail thresholds.","parentId":"C-170","level":2,"alias":""},{"provenance":"modeling","description":"Calculate and substantiate the measure’s value from governed evidence.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Performance Measure (M-* register)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-172","type":"capability","name":"Performance Measure Determination","definition":"Calculate and substantiate the measure’s value from governed evidence.","parentId":"C-170","level":2,"alias":""},{"provenance":"modeling","description":"Interpret, explain, review, and govern use of the measure and any decision implications.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Performance Measure (M-* register)"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-173","type":"capability","name":"Performance Measure Review","definition":"Interpret, explain, review, and govern use of the measure and any decision implications.","parentId":"C-170","level":2,"alias":""},{"provenance":"established","description":"Shared meaning and source authority must survive handoffs among Dispatch, Supply, Operations, and Technology.","why":"An ownership label alone does not make a source dependable.","decisions":"Resolve BO-05 enterprise authority before any R2 activation.","risks":"Do not transfer operating accountability to information stewards.","facts":[{"label":"Focal object","value":"Business Information Definition"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY","CAPABILITIES"],"id":"C-180","type":"capability","name":"Information Definition Governance","definition":"Establish shared business meaning, semantic accountability, quality requirements, and controlled changes to information definitions; exclude the operational decisions represented by that information.","parentId":null,"level":1,"alias":"Business Information Governance","target":"Archived v1.1 proposed rating: 2 → 3. These are authored judgments, not measured maturity or v1.2 achieved results.","assessment":{"band":"high","importance":4,"performance":2,"strength":0.65,"summary":"E-003: terminology and operating-source ambiguity; shared-object ownership and source authority remain a gap in Decision 1","limitation":"Ownership and source conflicts","source":"ASSESSMENT","status":"Illustrative v1.1 Decision 1 judgment"}},{"provenance":"modeling","description":"Specify a concept’s meaning, category, types, states, and typed relationships.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Business Information Definition"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-181","type":"capability","name":"Information Definition Structuring","definition":"Specify a concept’s meaning, category, types, states, and typed relationships.","parentId":"C-180","level":2,"alias":""},{"provenance":"modeling","description":"Assign and maintain accountable owners and stewards for the definition.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Business Information Definition"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-182","type":"capability","name":"Information Definition Stewardship","definition":"Assign and maintain accountable owners and stewards for the definition.","parentId":"C-180","level":2,"alias":""},{"provenance":"modeling","description":"Specify the quality rules and thresholds associated with the definition.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Business Information Definition"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-183","type":"capability","name":"Information Quality Rule Definition","definition":"Specify the quality rules and thresholds associated with the definition.","parentId":"C-180","level":2,"alias":""},{"provenance":"modeling","description":"Evaluate, authorize, version, and communicate changes in shared business meaning.","why":"It gives Northstar a stable boundary for an ability, independent of the team, process or application that realizes it.","decisions":"Scope an assessment or proposed change around this ability; inspect its documented dependencies before assigning investment priority.","risks":"Capability structure alone cannot establish maturity, causation, ROI, or investment priority.","facts":[{"label":"Focal object","value":"Business Information Definition"},{"label":"Hierarchy provenance","value":"Authored October 6, 2026 correction; added context does not imply an approved case decision."}],"sources":["HIERARCHY"],"id":"C-184","type":"capability","name":"Information Definition Change Control","definition":"Evaluate, authorize, version, and communicate changes in shared business meaning.","parentId":"C-180","level":2,"alias":""},{"provenance":"established","description":"ticket; service call; case","why":"A shared concept keeps Northstar teams from making different promises with the same words or treating unlike records as interchangeable.","decisions":"Agree its identity, meaning, lifecycle and business ownership before comparing measures or automating a handoff.","risks":"A concept is distinct from a report, database field, or application record.","facts":[{"label":"Concept category","value":"Primary (authored modeling judgment)"},{"label":"Source status","value":"Current service record accepted for R1"},{"label":"Nonterminal states","value":"Draft; Submitted; Accepted; Qualified; Planned"},{"label":"Terminal states","value":"Resolved; Declined; Cancelled"},{"label":"Concept types","value":"Not established by case; do not infer types from states."}],"sources":["OBJECTS"],"id":"BO-01","type":"information","name":"Service Request","definition":"A customer-recognized need for equipment service that Northstar has accepted for evaluation or action."},{"provenance":"established","description":"Preserve the original commitment, linked revisions, cancellation reasons, and recovery obligation.","why":"A later accepted date can be easier to meet while the customer waits longer.","decisions":"Specify original versus latest-promise metrics before comparing performance.","risks":"ETA is an estimate; a commit date is an attribute. Neither is automatically the business commitment.","facts":[{"label":"Concept category","value":"Primary (authored modeling judgment)"},{"label":"Source status","value":"Current promise record accepted for R1 under E-008 version/linkage audit; not declared the enterprise future-state source"},{"label":"Nonterminal states","value":"Proposed; Validated; Committed"},{"label":"Terminal states","value":"Fulfilled; Broken; Cancelled; or superseded by a linked Revised promise"},{"label":"Concept types","value":"Not established by case; do not infer types from states."}],"sources":["OBJECTS"],"id":"BO-02","type":"information","name":"Customer Promise","definition":"A governed commitment to provide a defined service outcome within stated conditions and timing."},{"provenance":"established","description":"job; service order","why":"A shared concept keeps Northstar teams from making different promises with the same words or treating unlike records as interchangeable.","decisions":"Agree its identity, meaning, lifecycle and business ownership before comparing measures or automating a handoff.","risks":"A concept is distinct from a report, database field, or application record.","facts":[{"label":"Concept category","value":"Primary (authored modeling judgment)"},{"label":"Source status","value":"Current work-order record accepted for R1"},{"label":"Nonterminal states","value":"Proposed; Authorized; Scheduled; In Progress; Completed; Suspended"},{"label":"Terminal states","value":"Closed; Cancelled"},{"label":"Concept types","value":"Not established by case; do not infer types from states."}],"sources":["OBJECTS"],"id":"BO-03","type":"information","name":"Work Order","definition":"An authorized unit of service work with scope, asset, status, and completion evidence."},{"provenance":"established","description":"unit; machine: contextual shorthand. serial: identifier, not an object synonym.","why":"A shared concept keeps Northstar teams from making different promises with the same words or treating unlike records as interchangeable.","decisions":"Agree its identity, meaning, lifecycle and business ownership before comparing measures or automating a handoff.","risks":"A concept is distinct from a report, database field, or application record.","facts":[{"label":"Concept category","value":"Primary (authored modeling judgment)"},{"label":"Source status","value":"Enterprise asset register accepted"},{"label":"Nonterminal states","value":"Registered; Available; Unavailable; Under Service"},{"label":"Terminal states","value":"Retired"},{"label":"Concept types","value":"Not established by case; do not infer types from states."}],"sources":["OBJECTS"],"id":"BO-04","type":"information","name":"Equipment Asset","definition":"A uniquely recognized item of customer equipment whose condition and service history matter."},{"provenance":"established","description":"Ownership was proposed in Decision 1 and confirmed for ORG-08 in Decision 2. The inventory record remains a provisional R1 source with twice-daily reconciliation.","why":"Reservation status must be both meaningful and fresh enough to support a promise.","decisions":"Close OI-06 for enterprise source authority; assess whether A4 removes a verified delay.","risks":"Seven of 24 inspected sequences had delayed updates; four uses of “allocated” did not mean confirmed. This purposive diagnostic is not an enterprise defect rate.","facts":[{"label":"Concept category","value":"Secondary (authored modeling judgment)"},{"label":"Source status","value":"Inventory reservation record accepted only as provisional R1 source with twice-daily reconciliation; enterprise authority remains OI-06"},{"label":"Nonterminal states","value":"Requested; Confirmed; Picked"},{"label":"Terminal states","value":"Consumed; Released; Expired"},{"label":"Concept types","value":"Not established by case; do not infer types from states."}],"sources":["OBJECTS","B"],"id":"BO-05","type":"information","name":"Part Reservation","definition":"A time-bounded allocation of a specific part quantity to planned service work."},{"provenance":"established","description":"An accepted assignment and verified skill qualification are separate checks.","why":"A person being scheduled does not establish suitability or available travel capacity.","decisions":"Validate skill signals and rural capacity before commitment.","risks":"The detailed object register assigns ORG-07 ownership; ORG-05 coordinates regional capacity. The compact workspace uses ORG-05 as owner, so the different scopes remain explicit.","facts":[{"label":"Concept category","value":"Secondary (authored modeling judgment)"},{"label":"Source status","value":"Scheduling record accepted for R1 subject to skill-data validation"},{"label":"Nonterminal states","value":"Proposed; Accepted; Dispatched; Arrived; In Progress"},{"label":"Terminal states","value":"Completed; Rejected; Reassigned; Cancelled"},{"label":"Concept types","value":"Not established by case; do not infer types from states."}],"sources":["OBJECTS"],"id":"BO-06","type":"information","name":"Technician Assignment","definition":"A governed allocation of a qualified technician and time window to service work."},{"provenance":"established","description":"Accepts, changes, or cancels the customer commitment on behalf of the customer","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Accepts, changes, or cancels the customer commitment on behalf of the customer"}],"sources":["CASE"],"id":"ORG-01","type":"actor","name":"Customer operations manager","definition":"Needs equipment restored when promised"},{"provenance":"established","description":"Owns branch adoption, local capacity choices, and use of the approved exception route","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Owns branch adoption, local capacity choices, and use of the approved exception route"}],"sources":["CASE"],"id":"ORG-02","type":"actor","name":"Branch manager","definition":"Balances customer commitments, capacity, margin, and local conditions"},{"provenance":"established","description":"Applies policy and raises exceptions; cannot waive enterprise guardrails","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Applies policy and raises exceptions; cannot waive enterprise guardrails"}],"sources":["CASE"],"id":"ORG-03","type":"actor","name":"Dispatcher","definition":"Creates feasible promises and sequences work"},{"provenance":"established","description":"Confirms execution facts and exception causes","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Confirms execution facts and exception causes"}],"sources":["CASE"],"id":"ORG-04","type":"actor","name":"Field technician","definition":"Executes work and records actual conditions"},{"provenance":"established","description":"Approves defined regional exceptions and is accountable for readiness across participating branches","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Approves defined regional exceptions and is accountable for readiness across participating branches"}],"sources":["CASE"],"id":"ORG-05","type":"actor","name":"Regional VP Operations","definition":"Coordinates capacity and resolves cross-branch operating conflicts"},{"provenance":"established","description":"Owns customer-disruption definition and service-recovery practice","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Owns customer-disruption definition and service-recovery practice"}],"sources":["CASE"],"id":"ORG-06","type":"actor","name":"VP Customer Operations","definition":"Represents customer outcome and service recovery"},{"provenance":"established","description":"Approves operating practices within delegated authority","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Approves operating practices within delegated authority"}],"sources":["CASE"],"id":"ORG-07","type":"actor","name":"VP Field Service","definition":"Owns field work planning, scheduling, execution, and workforce capacity"},{"provenance":"established","description":"Approves part-reservation rules and operating remediation","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Approves part-reservation rules and operating remediation"}],"sources":["CASE"],"id":"ORG-08","type":"actor","name":"VP Supply Operations","definition":"Owns part-availability operating performance"},{"provenance":"established","description":"Accountable for C-110 and C-170 performance and approves POL-01 with required contributors","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Accountable for C-110 and C-170 performance and approves POL-01 with required contributors"}],"sources":["CASE"],"id":"ORG-09","type":"actor","name":"EVP Service Operations","definition":"Sponsors I-01 and owns the service outcome"},{"provenance":"established","description":"Confirms business-object ownership and stewardship; does not own service performance","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Confirms business-object ownership and stewardship; does not own service performance"}],"sources":["CASE"],"id":"ORG-10","type":"actor","name":"Chief Data Officer","definition":"Owns enterprise information-governance policy"},{"provenance":"established","description":"Approves technology standards; does not own service-policy outcomes or vendor value claims","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Approves technology standards; does not own service-policy outcomes or vendor value claims"}],"sources":["CASE"],"id":"ORG-11","type":"actor","name":"Chief Information Officer","definition":"Owns technology standards and service risk"},{"provenance":"established","description":"Governs M-03 and validates cost and margin evidence","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Governs M-03 and validates cost and margin evidence"}],"sources":["CASE"],"id":"ORG-12","type":"actor","name":"Chief Financial Officer / Finance delegate","definition":"Protects financial definition and investment discipline"},{"provenance":"established","description":"Approves, conditions, defers, or rejects funding and later scale/procurement gates","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Approves, conditions, defers, or rejects funding and later scale/procurement gates"}],"sources":["CASE"],"id":"ORG-13","type":"actor","name":"Investment Council","definition":"Balances value, capacity, risk, and opportunity cost"},{"provenance":"established","description":"Frames, models, tests, recommends, and records; does not take the business decision","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Frames, models, tests, recommends, and records; does not take the business decision"}],"sources":["CASE"],"id":"ORG-14","type":"actor","name":"Business architect","definition":"Maintains the decision frame and architecture trace"},{"provenance":"established","description":"Under authority delegated by ORG-13, may activate, stagger, adapt, pause, or stop R1 within the approved scope and cost/capacity band. Only where a governed guardrail explicitly permits, it may authorize one contained remediation interval to the next formal review after the named owner validates the breach; it may not waive or renew the exception, expand to R2, exceed an investment boundary, or reopen procurement.","why":"It distinguishes the person or role contributing expertise from the authority accountable for a result or authorized to make a decision.","decisions":"Bring the appropriate operating, information or investment authority into the review and verify the limits of delegation.","risks":"Architecture stewardship does not confer investment or operating authority.","facts":[{"label":"Decision rights","value":"Under authority delegated by ORG-13, may activate, stagger, adapt, pause, or stop R1 within the approved scope and cost/capacity band. Only where a governed guardrail explicitly permits, it may authorize one contained remediation interval to the next formal review after the named owner validates the breach; it may not waive or renew the exception, expand to R2, exceed an investment boundary, or reopen procurement."}],"sources":["CASE"],"id":"ORG-15","type":"actor","name":"R1 Readiness Forum","definition":"Brings Operations, Customer, Field, Supply, Information, Technology, Finance, and Delivery evidence together for the authorized release"},{"provenance":"established","description":"Participating R1 branch units","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map.","risks":"Organizational contribution does not transfer decision rights or create a capability parent.","facts":[],"sources":["CASE"],"id":"OU-01","type":"organization","name":"Branch Operations","definition":"Participating R1 branch units"},{"provenance":"established","description":"Regions supporting the R1 branches","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map.","risks":"Organizational contribution does not transfer decision rights or create a capability parent.","facts":[],"sources":["CASE"],"id":"OU-02","type":"organization","name":"Regional Operations","definition":"Regions supporting the R1 branches"},{"provenance":"established","description":"Part availability and reservation operations","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map.","risks":"Organizational contribution does not transfer decision rights or create a capability parent.","facts":[],"sources":["CASE"],"id":"OU-03","type":"organization","name":"Supply Operations","definition":"Part availability and reservation operations"},{"provenance":"established","description":"Enterprise service performance and promise policy","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map.","risks":"Organizational contribution does not transfer decision rights or create a capability parent.","facts":[],"sources":["CASE"],"id":"OU-04","type":"organization","name":"Service Operations","definition":"Enterprise service performance and promise policy"},{"provenance":"established","description":"Shared business information and stewardship policy","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map.","risks":"Organizational contribution does not transfer decision rights or create a capability parent.","facts":[],"sources":["CASE"],"id":"OU-05","type":"organization","name":"Information Governance","definition":"Shared business information and stewardship policy"},{"provenance":"established","description":"Collaborative governance team for the authorized R1 release","why":"It makes a constituted unit’s contribution visible alongside the cross-functional customer-value path.","decisions":"Identify the units that need to coordinate capacity, handoffs or change adoption, without treating the org chart as a capability map.","risks":"Organizational contribution does not transfer decision rights or create a capability parent.","facts":[],"sources":["CASE"],"id":"OU-06","type":"organization","name":"R1 Readiness Forum","definition":"Collaborative governance team for the authorized R1 release"},{"provenance":"established","description":"The case’s change boundary connects policy, confirmation, exception practice, adoption, and measurement.","why":"It keeps the business problem visible while comparing several responses.","decisions":"Choose the smallest commitment that can resolve decision-changing uncertainty.","risks":"No recorded decision authorizes enterprise procurement or twelve-branch activation.","facts":[],"sources":["A","B"],"id":"I-01","type":"initiative","name":"Connected Service Promise","definition":"Proposed bounded business change, not approved technology."},{"provenance":"established","description":"Latest accepted promise adherence is only one lens on the customer’s experience.","why":"The denominator and promise version can change the apparent result.","decisions":"Compare original commitments, restoration time, scope, and branch variation.","risks":"The 82% enterprise dashboard is not a comparable pilot baseline. The 92% R1 gate does not replace the 95% strategic target.","facts":[],"sources":["B","C"],"id":"M-01","type":"measure","name":"Promise adherence","definition":"Cumulative latest-accepted-promise adherence;92%R1 gate versus95%strategic target. Original promise and restoration outcomes remain balancing measures.","measures":[{"label":"Latest accepted promise","value":"92.8%","period":"Days 1–90 · Feb 2–May 2, 2026","scope":"451/486 completed eligible promises; includes earlier removed-scope records","source":"DATA"},{"label":"metropolitan","value":"94.9%","period":"Days 1–90","scope":"167/176 eligible completed promises","source":"DATA"},{"label":"mixed","value":"94.0%","period":"Days 1–90","scope":"156/166 eligible completed promises","source":"DATA"},{"label":"rural","value":"88.9%","period":"Days 1–90","scope":"128/144 eligible completed promises","source":"DATA"}]},{"provenance":"established","description":"Repeat visits with disputed preventable-cause coding.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-02","type":"measure","name":"Avoidable repeat visits","definition":"Repeat visits with disputed preventable-cause coding.","measures":[{"label":"Repeat visits","value":"11%","period":"Day 90","scope":"Preventable-cause coding remains disputed; 8% strategic aspiration","source":"C"}]},{"provenance":"established","description":"Finance-governed cumulative margin and work-mix interpretation.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-03","type":"measure","name":"Gross service margin","definition":"Finance-governed cumulative margin and work-mix interpretation.","measures":[{"label":"Gross service margin","value":"31.2%","period":"Days 1–90","scope":"Cumulative governed margin; 31% minimum","source":"C"}]},{"provenance":"established","description":"Recorded part/skill confirmation;90%later-period gate; not identical to full policy compliance.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-04","type":"measure","name":"Part/skill confirmation","definition":"Recorded part/skill confirmation;90%later-period gate; not identical to full policy compliance.","measures":[{"label":"Part/skill confirmation","value":"92.1%","period":"Days 31–90","scope":"315/342; not a cumulative 90-day measure","source":"C"}]},{"provenance":"established","description":"Productivity deterioration with work-mix explanation.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-06","type":"measure","name":"Field productivity","definition":"Productivity deterioration with work-mix explanation.","measures":[{"label":"Productivity vs baseline","value":"−2.0%","period":"Day-90 review","scope":"Comparable baseline; 3% guardrail","source":"C"}]},{"provenance":"established","description":"Complete workflow or valid approved exception;85%day30 and95%later-period gates. Not nested within M-04.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-07","type":"measure","name":"Policy adoption","definition":"Complete workflow or valid approved exception;85%day30 and95%later-period gates. Not nested within M-04.","measures":[{"label":"Complete policy / exception","value":"95.9%","period":"Days 31–90","scope":"328/342; not a subset or superset of M-04","source":"C"}]},{"provenance":"established","description":"At most$300k fully loaded change cost and6peak temporary FTE; forecast excess requires prior scope/funding action; recurring burden separate.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-08","type":"measure","name":"Cost and capacity","definition":"At most$300k fully loaded change cost and6peak temporary FTE; forecast excess requires prior scope/funding action; recurring burden separate.","measures":[{"label":"Change cost / peak capacity","value":"$287k / 5.8 FTE","period":"Through day 90","scope":"Recurring manual-control cost is a separate operating estimate","source":"C"}]},{"provenance":"established","description":"Approved R1 policy: confirmation or a complete approved exception; preserve original/revised promise lineage,communication and recovery.","why":"It makes permitted operating decisions explicit at the point Northstar forms or revises a customer commitment.","decisions":"Check whether people can follow the rule, route an exception and obtain timely authority under real operating constraints.","risks":"Policy approval does not establish adoption or sufficient operating capacity.","facts":[],"sources":["A","B"],"id":"POL-01","type":"policy","name":"Service Promise Policy","definition":"Approved R1 policy: confirmation or a complete approved exception; preserve original/revised promise lineage,communication and recovery."},{"provenance":"established","description":"Escalations attributable to a missed or changed promise per 100 eligible commitments.","why":"It gives the decision a defined observation to inspect, including its population, period and limitations.","decisions":"Choose whether to continue, investigate or adapt using comparable measures and balancing evidence rather than one headline.","risks":"Different populations and promise versions cannot be compared as if they were interchangeable.","facts":[],"sources":["B","C"],"id":"M-05","type":"measure","name":"Customer escalations","definition":"Escalations attributable to a missed or changed promise per 100 eligible commitments.","measures":[{"label":"Escalations","value":"5.6 per 100","period":"Day-90 review","scope":"Eligible commitments; inspect case definition and tolerance","source":"C"}]},{"provenance":"established","description":"A three-branch experiment using existing systems and controlled manual work. The v1.2 reference path releases $15k for diagnosis, up to $75k cumulatively for preparation, and at most $300k after a separate operating-entry decision.","why":"A bounded experiment can reveal source, authority, capacity, and customer-value constraints.","decisions":"Continue, adapt, stop, or authorize further design using the actual evidence.","risks":"Operational feasibility at day 90 does not establish improved customer value or enterprise repeatability.","facts":[],"sources":["BRIEF-A","BRIEF-B","BRIEF-C"],"id":"R1","type":"release","name":"Three-branch feasibility release","definition":"Can the defined policy, information, exception, and operating practices work under three intentionally different conditions and produce decision-grade measures using existing systems?"},{"provenance":"established","description":"Twelve-branch repeatability is a future release boundary. DEC-005 permits design/readiness investigation only.","why":"Purposeful three-branch evidence cannot settle whether the practice repeats across the enterprise.","decisions":"Resolve customer value, source authority, rural capacity, recurring cost, and new exit criteria before requesting activation.","risks":"Activation is not authorized. Do not treat the diagram as an approved roadmap.","facts":[],"sources":["CASE","BRIEF-C"],"id":"R2","type":"release","name":"Twelve-branch repeatability release","definition":"Can the operating model be repeated across regions and broader work types without unacceptable local workarounds, cost, or performance variance?"},{"provenance":"established","description":"Enterprise rollout and only the technology required for confirmed residual gaps","why":"It bounds what Northstar proposes to learn or establish at one point in the change, preserving the conditions for a later commitment.","decisions":"Check operating entry, exit, continuation and stop conditions before approving activation or expansion.","risks":"Platform procurement requires its own business case and decision after repeatability evidence; R2 success does not automatically select a vendor.","facts":[],"sources":["CASE"],"id":"R3","type":"release","name":"Enterprise enablement","definition":"What enterprise operating model and automation are justified by repeatable evidence?"},{"provenance":"established","description":"O-01/O-02/O-03, BO-02, Operations and Customer approval","why":"It separates coherent work inside the initiative so that prerequisites and handoffs can be reviewed.","decisions":"Coordinate sequencing, ownership and readiness with related packages; an architectural dependency alone is not a delivery estimate.","risks":"Original Decision 1 status: Proposed; not approved merely because R1 is funded. Later readiness and results require the evidence for those decisions.","facts":[],"sources":["CASE"],"id":"CP-01","type":"change-package","name":"Promise definition and policy","definition":"One usable rule for creating, changing, cancelling, and recovering customer commitments"},{"provenance":"established","description":"BO-05 owner/source decision; skill-data validation","why":"It separates coherent work inside the initiative so that prerequisites and handoffs can be reviewed.","decisions":"Coordinate sequencing, ownership and readiness with related packages; an architectural dependency alone is not a delivery estimate.","risks":"Original Decision 1 status: Proposed. Later readiness and results require the evidence for those decisions.","facts":[],"sources":["CASE"],"id":"CP-02","type":"change-package","name":"Parts and skills confirmation","definition":"Dispatcher can distinguish confirmed, provisional, and unavailable prerequisites"},{"provenance":"established","description":"POL-01, M-07, the one-shift exception criterion, and named escalation authority","why":"It separates coherent work inside the initiative so that prerequisites and handoffs can be reviewed.","decisions":"Coordinate sequencing, ownership and readiness with related packages; an architectural dependency alone is not a delivery estimate.","risks":"Original Decision 1 status: Proposed. Later readiness and results require the evidence for those decisions.","facts":[],"sources":["CASE"],"id":"CP-03","type":"change-package","name":"Scheduling and branch-exception practice","definition":"Promise reflects geography and capacity while legitimate local discretion remains usable"},{"provenance":"established","description":"CP-01–CP-03 and readiness evidence","why":"It separates coherent work inside the initiative so that prerequisites and handoffs can be reviewed.","decisions":"Coordinate sequencing, ownership and readiness with related packages; an architectural dependency alone is not a delivery estimate.","risks":"Original Decision 1 status: Proposed. Later readiness and results require the evidence for those decisions.","facts":[],"sources":["CASE"],"id":"CP-04","type":"change-package","name":"R1 enablement and adoption","definition":"Three branches can operate, audit, support, and reverse the change"},{"provenance":"established","description":"M-01–M-08, E-008–E-010","why":"It separates coherent work inside the initiative so that prerequisites and handoffs can be reviewed.","decisions":"Coordinate sequencing, ownership and readiness with related packages; an architectural dependency alone is not a delivery estimate.","risks":"Original Decision 1 status: Proposed. Later readiness and results require the evidence for those decisions.","facts":[],"sources":["CASE"],"id":"CP-05","type":"change-package","name":"Measurement and investment review","definition":"Decision forums can continue, adapt, scale, procure, or stop using governed evidence"},{"provenance":"established","description":"A credible alternative or complement to the operating experiment. The planning range is $60–120k and one to two temporary FTE, conditional on usable source semantics.","why":"A narrow integration may remove delay at lower commitment if the underlying signals are reliable.","decisions":"Compare against operating correction and the platform after timing the actual bottleneck.","risks":"It cannot fix technician scarcity, travel, or disputed promise policy. No approval or benefit is implied.","facts":[],"sources":["A"],"id":"A4","type":"initiative","name":"Targeted integration","definition":"A reservation/skill-status feed and dispatcher exception queue using existing systems."},{"provenance":"established","description":"$25–75k and 0.5–1 temporary FTE are planning ranges in E-007.","why":"Measurement repair may change the apparent problem before a broader investment.","decisions":"Prefer this option if reconciliation eliminates the supposed performance gap.","risks":"It does not directly test or change operating practice.","facts":[],"sources":["A"],"id":"A0","type":"initiative","name":"Reconcile measures first","definition":"Clarify definitions and improve reporting without changing the promise practice."},{"provenance":"established","description":"The vendor proposes $4–7 million over 18–24 months. A controlled demonstration blocked commitments with missing part/skill fields.","why":"Automation may address a residual gap once that gap and adoption conditions are established.","decisions":"Retain DEC-002 procurement deferral; compare alternatives against verified constraints.","risks":"No live Northstar feed, representative rural work, adoption evidence, or customer-value experiment supported the demonstration.","facts":[],"sources":["A","BRIEF-C"],"id":"A3","type":"initiative","name":"Enterprise scheduling platform","definition":"Procure and deploy the proposed enterprise scheduling product."},{"provenance":"modeling","description":"Context concept from the corrected hierarchy. Part Reservation depends on a quantity of this concept.","why":"A reservation and the thing reserved have different identities and lifecycles.","decisions":"Keep object boundaries clear when assigning ownership.","risks":"This context concept is an authored modeling addition, not new operating evidence.","facts":[],"sources":["HIERARCHY","CASE"],"id":"HC-PART","type":"information","name":"Part","definition":"A physical component used in equipment service."},{"provenance":"modeling","description":"Context concept from the corrected hierarchy. Technician Assignment allocates the person’s capacity.","why":"A person and an assignment are distinct concepts.","decisions":"Distinguish capability decomposition from resource dependencies.","risks":"No additional people, roles, or staffing levels are inferred.","facts":[],"sources":["HIERARCHY","CASE"],"id":"HC-HUMAN-RESOURCE","type":"information","name":"Human Resource","definition":"A person whose work is used by the enterprise."},{"provenance":"modeling","description":"E-008 accepts it for R1 only, with twice-daily reconciliation. This Atlas ID identifies an already documented record; no product or database design is invented.","why":"The record can lag the physical reservation state.","decisions":"Resolve enterprise authority and source freshness before integrating its status.","risks":"A named record does not establish an enterprise system of record.","facts":[],"sources":["B"],"id":"SYS-RESERVATION","type":"technology","name":"Inventory reservation record","definition":"The existing inventory record used as the provisional R1 reservation-status source."},{"provenance":"modeling","description":"An Atlas identifier for the supporting record in E-008, not a new application.","why":"Promise lineage is necessary to compare original and revised commitments.","decisions":"Verify lineage and audit rules for readiness.","risks":"R1 acceptance does not select enterprise future-state technology.","facts":[],"sources":["B"],"id":"SYS-PROMISE","type":"technology","name":"Current service-promise record","definition":"The existing record accepted for R1 under versioning, original/revised linkage, and audit rules."},{"provenance":"established","description":"Recorded fictional reference disposition. Conditions remain attached to the decision.","why":"It preserves what Northstar actually authorized, who held authority and which conditions remain attached.","decisions":"Determine the next permitted action and the evidence or separate authorization required before expanding the commitment.","risks":"A later result does not rewrite what was knowable at the original decision.","facts":[],"sources":["BRIEF-A"],"id":"DEC-001","type":"decision","name":"Fund a bounded diagnostic","definition":"Only the first $15k is released initially within a conditional $150–300k A1/R1 envelope. Preparation and activation each require subsequent decisions."},{"provenance":"established","description":"Recorded fictional reference disposition. Conditions remain attached to the decision.","why":"It preserves what Northstar actually authorized, who held authority and which conditions remain attached.","decisions":"Determine the next permitted action and the evidence or separate authorization required before expanding the commitment.","risks":"A later result does not rewrite what was knowable at the original decision.","facts":[],"sources":["BRIEF-A"],"id":"DEC-002","type":"decision","name":"Defer platform procurement","definition":"Keep procurement deferred pending repeatability-quality evidence, residual-gap analysis, and a separate comparison and authorization."},{"provenance":"established","description":"Recorded fictional reference disposition. Conditions remain attached to the decision.","why":"It preserves what Northstar actually authorized, who held authority and which conditions remain attached.","decisions":"Determine the next permitted action and the evidence or separate authorization required before expanding the commitment.","risks":"A later result does not rewrite what was knowable at the original decision.","facts":[],"sources":["BRIEF-B"],"id":"DEC-003","type":"decision","name":"Begin R1 only when ready","definition":"Authorize a staggered start after remaining training and baseline reconciliation. Temporary source and backup-approver conditions expire at day 30 unless explicitly reviewed."},{"provenance":"established","description":"Recorded fictional reference disposition. Conditions remain attached to the decision.","why":"It preserves what Northstar actually authorized, who held authority and which conditions remain attached.","decisions":"Determine the next permitted action and the evidence or separate authorization required before expanding the commitment.","risks":"A later result does not rewrite what was knowable at the original decision.","facts":[],"sources":["C"],"id":"DEC-004","type":"decision","name":"Continue one remediation interval","definition":"Continue only to day 90 under the delegated margin exception. Narrow admissions, repair controls, review workload, and prohibit expansion."},{"provenance":"established","description":"Recorded fictional reference disposition. Conditions remain attached to the decision.","why":"It preserves what Northstar actually authorized, who held authority and which conditions remain attached.","decisions":"Determine the next permitted action and the evidence or separate authorization required before expanding the commitment.","risks":"A later result does not rewrite what was knowable at the original decision.","facts":[],"sources":["BRIEF-C"],"id":"DEC-005","type":"decision","name":"Investigate before expansion","definition":"Authorize R2 design/readiness investigation only. Require customer-value investigation; prohibit twelve-branch activation and retain procurement deferral."},{"provenance":"modeling","description":"Atlas identifier for an existing v1.2 customer-outcome measure. Exact counts are authored teaching data.","why":"The customer experience can diverge from latest-promise adherence.","decisions":"Investigate case mix, revisions, demand, and capacity before declaring value or attributing harm.","risks":"Descriptive comparison without a control group or case-mix adjustment; no causal attribution.","facts":[],"sources":["C","DATA"],"id":"M-ORIGINAL","type":"measure","name":"Original-promise fulfillment","definition":"Fulfillment of the original commitment within the retained-scope completed-restoration cohort.","measures":[{"label":"Early retained scope","value":"87.7%","period":"Days 1–30 · Feb 2–Mar 3, 2026","scope":"100/114 original promises fulfilled","source":"DATA"},{"label":"Later retained scope","value":"78.4%","period":"Days 31–90 · Mar 4–May 2, 2026","scope":"268/342 original promises fulfilled","source":"DATA"}]},{"provenance":"modeling","description":"Atlas identifier for an existing v1.2 customer-outcome measure. Exact counts are authored teaching data.","why":"The customer experience can diverge from latest-promise adherence.","decisions":"Investigate case mix, revisions, demand, and capacity before declaring value or attributing harm.","risks":"Descriptive comparison without a control group or case-mix adjustment; no causal attribution.","facts":[],"sources":["C","DATA"],"id":"M-RESTORATION","type":"measure","name":"Time to restored availability","definition":"Mean elapsed restoration hours within the retained-scope completed-restoration cohort.","measures":[{"label":"Early retained scope","value":"40 hours","period":"Days 1–30 · Feb 2–Mar 3, 2026","scope":"4,560/114 elapsed hours / completed restoration episodes","source":"DATA"},{"label":"Later retained scope","value":"48 hours","period":"Days 31–90 · Mar 4–May 2, 2026","scope":"16,416/342 elapsed hours / completed restoration episodes","source":"DATA"}]}],"relationships":[{"id":"REL-001","source":"O-01","type":"requires","target":"OUT-01","description":"The intended outcome is stated in the original strategic-intent table.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-002","source":"O-02","type":"requires","target":"OUT-02","description":"The intended outcome is stated in the original strategic-intent table.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-003","source":"O-03","type":"requires","target":"OUT-03","description":"The intended outcome is stated in the original strategic-intent table.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-004","source":"ORG-01","type":"triggers","target":"VS-01","description":"The customer operations manager has equipment unavailable or at risk and initiates the service need. The Atlas makes this role explicit from the case’s stakeholder and stage definitions.","sources":["CASE","CROSSMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-005","source":"ORG-01","type":"desires","target":"VP-01","description":"The triggering stakeholder seeks restored usable equipment availability.","sources":["CASE","CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-006","source":"VS-01","type":"delivers","target":"VP-01","description":"Successful completion delivers the value proposition. Recovery and termination without fulfillment are separate dispositions.","sources":["CASE","CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-007","source":"VS-01","type":"contains","target":"ST-01","description":"The value stream decomposes into this stage, which delivers an increment of stakeholder value.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-008","source":"ST-01","type":"delivers","target":"VI-01","description":"This stage delivers the value item documented in its stage card.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-009","source":"VI-01","type":"accrues-to","target":"VP-01","description":"This value contribution supports the whole proposition. Accumulation is conceptual, not an arithmetic sum; recovery evidence and unfulfilled termination do not establish restored availability.","sources":["CROSSMAP","CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-010","source":"ORG-01","type":"participates-in","target":"ST-01","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-011","source":"ORG-03","type":"participates-in","target":"ST-01","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-012","source":"ST-01","type":"accountable-to","target":"ORG-06","description":"Stage accountability as defined in the Northstar stage cards.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-013","source":"VS-01","type":"contains","target":"ST-02","description":"The value stream decomposes into this stage, which delivers an increment of stakeholder value.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-014","source":"ST-02","type":"delivers","target":"VI-02","description":"This stage delivers the value item documented in its stage card.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-015","source":"VI-02","type":"accrues-to","target":"VP-01","description":"This value contribution supports the whole proposition. Accumulation is conceptual, not an arithmetic sum; recovery evidence and unfulfilled termination do not establish restored availability.","sources":["CROSSMAP","CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-016","source":"ORG-01","type":"participates-in","target":"ST-02","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-017","source":"ORG-03","type":"participates-in","target":"ST-02","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-018","source":"ORG-02","type":"participates-in","target":"ST-02","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-019","source":"ORG-05","type":"participates-in","target":"ST-02","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-020","source":"ST-02","type":"accountable-to","target":"ORG-09","description":"Stage accountability as defined in the Northstar stage cards.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-021","source":"VS-01","type":"contains","target":"ST-03","description":"The value stream decomposes into this stage, which delivers an increment of stakeholder value.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-022","source":"ST-03","type":"delivers","target":"VI-03","description":"This stage delivers the value item documented in its stage card.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-023","source":"VI-03","type":"accrues-to","target":"VP-01","description":"This value contribution supports the whole proposition. Accumulation is conceptual, not an arithmetic sum; recovery evidence and unfulfilled termination do not establish restored availability.","sources":["CROSSMAP","CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-024","source":"ORG-03","type":"participates-in","target":"ST-03","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-025","source":"ORG-04","type":"participates-in","target":"ST-03","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-026","source":"ORG-01","type":"participates-in","target":"ST-03","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-027","source":"ST-03","type":"accountable-to","target":"ORG-07","description":"Stage accountability as defined in the Northstar stage cards.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-028","source":"VS-01","type":"contains","target":"ST-04","description":"The value stream decomposes into this stage, which delivers an increment of stakeholder value.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-029","source":"ST-04","type":"delivers","target":"VI-04","description":"This stage delivers the value item documented in its stage card.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-030","source":"VI-04","type":"accrues-to","target":"VP-01","description":"This value contribution supports the whole proposition. Accumulation is conceptual, not an arithmetic sum; recovery evidence and unfulfilled termination do not establish restored availability.","sources":["CROSSMAP","CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-031","source":"ORG-04","type":"participates-in","target":"ST-04","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-032","source":"ORG-01","type":"participates-in","target":"ST-04","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-033","source":"ST-04","type":"accountable-to","target":"ORG-07","description":"Stage accountability as defined in the Northstar stage cards.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-034","source":"VS-01","type":"contains","target":"ST-05","description":"The value stream decomposes into this stage, which delivers an increment of stakeholder value.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-035","source":"ST-05","type":"delivers","target":"VI-05","description":"This stage delivers the value item documented in its stage card.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-036","source":"VI-05","type":"accrues-to","target":"VP-01","description":"This value contribution supports the whole proposition. Accumulation is conceptual, not an arithmetic sum; recovery evidence and unfulfilled termination do not establish restored availability.","sources":["CROSSMAP","CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-037","source":"ORG-01","type":"participates-in","target":"ST-05","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-038","source":"ORG-04","type":"participates-in","target":"ST-05","description":"The stage card identifies this participating stakeholder. Participation is distinct from triggering the whole stream and from stage accountability.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-039","source":"ST-05","type":"accountable-to","target":"ORG-06","description":"Stage accountability as defined in the Northstar stage cards.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-040","source":"C-010","type":"contains","target":"C-100","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-041","source":"C-100","type":"accountable-to","target":"ORG-06","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-042","source":"C-010","type":"contains","target":"C-160","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-043","source":"C-160","type":"accountable-to","target":"ORG-06","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-044","source":"C-110","type":"accountable-to","target":"ORG-09","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-045","source":"C-110","type":"contains","target":"C-111","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-046","source":"C-110","type":"contains","target":"C-112","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-047","source":"C-110","type":"contains","target":"C-113","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-048","source":"C-110","type":"contains","target":"C-114","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-049","source":"C-110","type":"contains","target":"C-115","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-050","source":"C-030","type":"contains","target":"C-120","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-051","source":"C-120","type":"accountable-to","target":"ORG-07","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-052","source":"C-030","type":"contains","target":"C-150","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-053","source":"C-150","type":"accountable-to","target":"ORG-07","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-054","source":"C-030","type":"contains","target":"C-151","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-055","source":"C-040","type":"contains","target":"C-131","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-056","source":"C-040","type":"contains","target":"C-132","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-057","source":"C-040","type":"contains","target":"C-133","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-058","source":"C-040","type":"contains","target":"C-130","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-059","source":"C-130","type":"accountable-to","target":"ORG-07","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-060","source":"C-050","type":"contains","target":"C-141","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-061","source":"C-050","type":"contains","target":"C-142","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-062","source":"C-050","type":"contains","target":"C-140","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-063","source":"C-140","type":"accountable-to","target":"ORG-08","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-064","source":"C-050","type":"contains","target":"C-143","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-065","source":"C-170","type":"accountable-to","target":"ORG-09","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-066","source":"C-170","type":"contains","target":"C-171","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-067","source":"C-170","type":"contains","target":"C-172","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-068","source":"C-170","type":"contains","target":"C-173","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-069","source":"C-180","type":"accountable-to","target":"ORG-10","description":"Performance accountability from the detailed capability register; architecture stewardship remains separate.","sources":["CAPABILITIES"],"provenance":"documented","confidence":"high"},{"id":"REL-070","source":"C-180","type":"contains","target":"C-181","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-071","source":"C-180","type":"contains","target":"C-182","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-072","source":"C-180","type":"contains","target":"C-183","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-073","source":"C-180","type":"contains","target":"C-184","description":"A finer ability within the same focal object boundary. This is decomposition, not a process or organizational relationship.","sources":["HIERARCHY"],"provenance":"documented","confidence":"high"},{"id":"REL-074","source":"C-100","type":"enables","target":"ST-01","description":"Primary at ST-01; it does not make the customer promise.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-075","source":"C-100","type":"enables","target":"ST-02","description":"Primary at ST-01; it does not make the customer promise.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-076","source":"C-110","type":"enables","target":"ST-02","description":"Primary at ST-02; monitors and changes the promise but does not own final-value confirmation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-077","source":"C-110","type":"enables","target":"ST-03","description":"Primary at ST-02; monitors and changes the promise but does not own final-value confirmation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-078","source":"C-110","type":"enables","target":"ST-05","description":"Primary at ST-02; monitors and changes the promise but does not own final-value confirmation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-079","source":"C-120","type":"enables","target":"ST-02","description":"Primary at ST-03 for work scope and prerequisites.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-080","source":"C-120","type":"enables","target":"ST-03","description":"Primary at ST-03 for work scope and prerequisites.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-081","source":"C-120","type":"enables","target":"ST-04","description":"Primary at ST-03 for work scope and prerequisites.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-082","source":"C-130","type":"enables","target":"ST-02","description":"Supports ST-02 feasibility; primary at ST-03 for qualified people, time, geography, and capacity.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-083","source":"C-130","type":"enables","target":"ST-03","description":"Supports ST-02 feasibility; primary at ST-03 for qualified people, time, geography, and capacity.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-084","source":"C-130","type":"enables","target":"ST-04","description":"Supports ST-02 feasibility; primary at ST-03 for qualified people, time, geography, and capacity.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-085","source":"C-140","type":"enables","target":"ST-02","description":"Supports ST-02 feasibility; primary at ST-03 for required part reservation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-086","source":"C-140","type":"enables","target":"ST-03","description":"Supports ST-02 feasibility; primary at ST-03 for required part reservation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-087","source":"C-140","type":"enables","target":"ST-04","description":"Supports ST-02 feasibility; primary at ST-03 for required part reservation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-088","source":"C-150","type":"enables","target":"ST-03","description":"Primary at ST-04; records work but does not confirm customer acceptance.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-089","source":"C-150","type":"enables","target":"ST-04","description":"Primary at ST-04; records work but does not confirm customer acceptance.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-090","source":"C-150","type":"enables","target":"ST-05","description":"Primary at ST-04; records work but does not confirm customer acceptance.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-091","source":"C-160","type":"enables","target":"ST-04","description":"Primary at ST-05 for restored-value confirmation, continued recovery, or explicit termination without fulfillment. Recovery ownership alone does not close the value obligation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-092","source":"C-160","type":"enables","target":"ST-05","description":"Primary at ST-05 for restored-value confirmation, continued recovery, or explicit termination without fulfillment. Recovery ownership alone does not close the value obligation.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Primary"},{"id":"REL-093","source":"C-170","type":"enables","target":"ST-01","description":"Cross-stage measure and guardrail governance; not a transaction owner.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-094","source":"C-170","type":"enables","target":"ST-02","description":"Cross-stage measure and guardrail governance; not a transaction owner.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-095","source":"C-170","type":"enables","target":"ST-03","description":"Cross-stage measure and guardrail governance; not a transaction owner.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-096","source":"C-170","type":"enables","target":"ST-04","description":"Cross-stage measure and guardrail governance; not a transaction owner.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-097","source":"C-170","type":"enables","target":"ST-05","description":"Cross-stage measure and guardrail governance; not a transaction owner.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-098","source":"C-180","type":"enables","target":"ST-01","description":"Cross-stage semantics, ownership, stewardship, and quality thresholds.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-099","source":"C-180","type":"enables","target":"ST-02","description":"Cross-stage semantics, ownership, stewardship, and quality thresholds.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-100","source":"C-180","type":"enables","target":"ST-03","description":"Cross-stage semantics, ownership, stewardship, and quality thresholds.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-101","source":"C-180","type":"enables","target":"ST-04","description":"Cross-stage semantics, ownership, stewardship, and quality thresholds.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-102","source":"C-180","type":"enables","target":"ST-05","description":"Cross-stage semantics, ownership, stewardship, and quality thresholds.","sources":["CROSSMAP"],"provenance":"documented","confidence":"high","contribution":"Supporting"},{"id":"REL-103","source":"BO-01","type":"owned-by","target":"ORG-06","description":"Business-object ownership follows the detailed object register; BO-05 ownership is confirmed in E-008 for R1.","sources":["OBJECTS","B"],"provenance":"documented","confidence":"high"},{"id":"REL-104","source":"C-100","type":"uses","target":"BO-01","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-105","source":"C-120","type":"uses","target":"BO-01","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-106","source":"BO-02","type":"owned-by","target":"ORG-09","description":"Business-object ownership follows the detailed object register; BO-05 ownership is confirmed in E-008 for R1.","sources":["OBJECTS","B"],"provenance":"documented","confidence":"high"},{"id":"REL-107","source":"C-110","type":"uses","target":"BO-02","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-108","source":"C-160","type":"uses","target":"BO-02","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-109","source":"BO-03","type":"owned-by","target":"ORG-07","description":"Business-object ownership follows the detailed object register; BO-05 ownership is confirmed in E-008 for R1.","sources":["OBJECTS","B"],"provenance":"documented","confidence":"high"},{"id":"REL-110","source":"C-120","type":"uses","target":"BO-03","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-111","source":"C-150","type":"uses","target":"BO-03","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-112","source":"BO-04","type":"owned-by","target":"ORG-06","description":"Business-object ownership follows the detailed object register; BO-05 ownership is confirmed in E-008 for R1.","sources":["OBJECTS","B"],"provenance":"documented","confidence":"high"},{"id":"REL-113","source":"C-100","type":"uses","target":"BO-04","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-114","source":"C-150","type":"uses","target":"BO-04","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-115","source":"BO-05","type":"owned-by","target":"ORG-08","description":"Business-object ownership follows the detailed object register; BO-05 ownership is confirmed in E-008 for R1.","sources":["OBJECTS","B"],"provenance":"documented","confidence":"high"},{"id":"REL-116","source":"C-140","type":"uses","target":"BO-05","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-117","source":"BO-06","type":"owned-by","target":"ORG-07","description":"Business-object ownership follows the detailed object register; BO-05 ownership is confirmed in E-008 for R1.","sources":["OBJECTS","B"],"provenance":"documented","confidence":"high"},{"id":"REL-118","source":"C-130","type":"uses","target":"BO-06","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-119","source":"C-150","type":"uses","target":"BO-06","description":"The object register identifies this concept as relevant to the capability.","sources":["OBJECTS"],"provenance":"documented","confidence":"high"},{"id":"REL-120","source":"OU-01","type":"accountable-to","target":"ORG-02","description":"The constituted unit and its accountable actor are distinct entries.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-121","source":"OU-02","type":"accountable-to","target":"ORG-05","description":"The constituted unit and its accountable actor are distinct entries.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-122","source":"OU-03","type":"accountable-to","target":"ORG-08","description":"The constituted unit and its accountable actor are distinct entries.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-123","source":"OU-04","type":"accountable-to","target":"ORG-09","description":"The constituted unit and its accountable actor are distinct entries.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-124","source":"OU-05","type":"accountable-to","target":"ORG-10","description":"The constituted unit and its accountable actor are distinct entries.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-125","source":"OU-06","type":"accountable-to","target":"ORG-15","description":"The constituted unit and its accountable actor are distinct entries.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-126","source":"OU-01","type":"contributes-to","target":"C-110","description":"Operates the promise practice; accountable for branch adoption and local capacity choice Local authority was previously implicit","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-127","source":"OU-02","type":"contributes-to","target":"C-130","description":"Governs cross-branch capacity and approves defined regional exceptions Escalation capacity is limited during peak demand","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-128","source":"OU-03","type":"contributes-to","target":"C-140","description":"Accountable for part-availability performance and confirmed BO-05 business-object owner Provisional R1 source can lag physical stock changes and is not authoritative enterprise-wide","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-129","source":"OU-03","type":"contributes-to","target":"BO-05","description":"Accountable for part-availability performance and confirmed BO-05 business-object owner Provisional R1 source can lag physical stock changes and is not authoritative enterprise-wide","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-130","source":"OU-04","type":"contributes-to","target":"C-110","description":"Accountable for capability performance and POL-01 Cannot make Finance or customer-risk decisions alone","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-131","source":"OU-04","type":"contributes-to","target":"C-170","description":"Accountable for capability performance and POL-01 Cannot make Finance or customer-risk decisions alone","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-132","source":"OU-05","type":"contributes-to","target":"C-180","description":"Governs ownership, stewardship, and semantic change Stewardship had been confused with operational accountability","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-133","source":"OU-05","type":"contributes-to","target":"BO-02","description":"Governs ownership, stewardship, and semantic change Stewardship had been confused with operational accountability","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-134","source":"OU-05","type":"contributes-to","target":"BO-05","description":"Governs ownership, stewardship, and semantic change Stewardship had been confused with operational accountability","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-135","source":"OU-06","type":"contributes-to","target":"C-170","description":"Integrates readiness and early-life evidence and exercises delegated R1 release authority Cannot expand to R2, waive the investment band, or reopen procurement","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-136","source":"BO-02","type":"association","target":"BO-01","description":"A promise addresses an accepted service need; operational validation against a request does not alone establish existence dependence.","sources":["OBJECTS"],"provenance":"documented","confidence":"high","label":"commits to satisfy"},{"id":"REL-137","source":"BO-03","type":"association","target":"BO-04","description":"A work order specifies work on recognized equipment.","sources":["OBJECTS"],"provenance":"documented","confidence":"high","label":"authorizes work on"},{"id":"REL-138","source":"BO-05","type":"existence-dependency","target":"HC-PART","description":"A reservation cannot exist as a reservation without a part quantity. HC-PART is the added Part concept from the hierarchy.","sources":["OBJECTS"],"provenance":"documented","confidence":"high","label":"allocates quantity of"},{"id":"REL-139","source":"BO-05","type":"association","target":"BO-03","description":"A reservation supports planned service work; this relationship does not create a second capability parent.","sources":["OBJECTS"],"provenance":"documented","confidence":"high","label":"reserves for"},{"id":"REL-140","source":"BO-06","type":"existence-dependency","target":"HC-HUMAN-RESOURCE","description":"An assignment allocates a qualified person’s time. HC-HUMAN-RESOURCE is the added Human Resource concept from the hierarchy.","sources":["OBJECTS"],"provenance":"documented","confidence":"high","label":"allocates capacity of"},{"id":"REL-141","source":"BO-06","type":"association","target":"BO-03","description":"A technician assignment supports the authorized service work.","sources":["OBJECTS"],"provenance":"documented","confidence":"high","label":"assigns to"},{"id":"REL-142","source":"OUT-01","type":"requires","target":"C-110","description":"Promises precede feasibility confirmation; one policy must retain a usable, bounded exception route.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-143","source":"OUT-01","type":"measured-by","target":"M-01","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-144","source":"OUT-01","type":"measured-by","target":"M-04","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-145","source":"OUT-01","type":"measured-by","target":"M-07","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-146","source":"OUT-01","type":"requires","target":"C-140","description":"Part status is assumed or locally interpreted; the R1 source is provisional and requires reconciliation.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-147","source":"OUT-01","type":"requires","target":"C-130","description":"Skills, geography, and capacity need consistent validation without centralizing every branch choice.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-148","source":"OUT-01","type":"measured-by","target":"M-06","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-149","source":"OUT-01","type":"requires","target":"C-170","description":"Regional definitions prevent reliable comparison and obscure whether discretion and exceptions are working.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-150","source":"OUT-02","type":"requires","target":"C-150","description":"Sustain execution while exposing any transfer of margin, productivity, implementation cost, or capacity burden.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-151","source":"OUT-02","type":"measured-by","target":"M-03","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-152","source":"OUT-02","type":"measured-by","target":"M-06","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-153","source":"OUT-02","type":"measured-by","target":"M-08","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-154","source":"OUT-02","type":"requires","target":"C-180","description":"Govern shared business-object semantics, ownership and stewardship, source status, and quality thresholds used by M-04 and M-08 evidence; do not own service performance.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-155","source":"OUT-02","type":"measured-by","target":"M-04","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-156","source":"OUT-03","type":"requires","target":"C-160","description":"Broken promises, customer acceptance, recovery ownership, and outcome closure must be consistently reconciled.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-157","source":"OUT-03","type":"measured-by","target":"M-02","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-158","source":"OUT-03","type":"measured-by","target":"M-05","description":"The original strategy linkage identifies this measure; its current interpretation uses v1.2 evidence.","sources":["STRATEGY","B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-159","source":"OUT-03","type":"requires","target":"C-170","description":"Repeat-visit, escalation, and branch-variation definitions must support comparable learning.","sources":["STRATEGY"],"provenance":"inferred","confidence":"medium"},{"id":"REL-160","source":"DEC-001","type":"accountable-to","target":"ORG-13","description":"This actor owns the recorded reference disposition.","sources":["BRIEF-A"],"provenance":"documented","confidence":"high"},{"id":"REL-161","source":"DEC-001","type":"constrains","target":"R1","description":"Only the first $15k is released initially within a conditional $150–300k A1/R1 envelope. Preparation and activation each require subsequent decisions.","sources":["BRIEF-A"],"provenance":"documented","confidence":"high"},{"id":"REL-162","source":"DEC-002","type":"accountable-to","target":"ORG-13","description":"This actor owns the recorded reference disposition.","sources":["BRIEF-A"],"provenance":"documented","confidence":"high"},{"id":"REL-163","source":"DEC-002","type":"constrains","target":"A3","description":"Keep procurement deferred pending repeatability-quality evidence, residual-gap analysis, and a separate comparison and authorization.","sources":["BRIEF-A"],"provenance":"documented","confidence":"high"},{"id":"REL-164","source":"DEC-003","type":"accountable-to","target":"ORG-15","description":"This actor owns the recorded reference disposition.","sources":["BRIEF-B"],"provenance":"documented","confidence":"high"},{"id":"REL-165","source":"DEC-003","type":"constrains","target":"R1","description":"Authorize a staggered start after remaining training and baseline reconciliation. Temporary source and backup-approver conditions expire at day 30 unless explicitly reviewed.","sources":["BRIEF-B"],"provenance":"documented","confidence":"high"},{"id":"REL-166","source":"DEC-004","type":"accountable-to","target":"ORG-15","description":"This actor owns the recorded reference disposition.","sources":["C"],"provenance":"documented","confidence":"high"},{"id":"REL-167","source":"DEC-004","type":"constrains","target":"R1","description":"Continue only to day 90 under the delegated margin exception. Narrow admissions, repair controls, review workload, and prohibit expansion.","sources":["C"],"provenance":"documented","confidence":"high"},{"id":"REL-168","source":"DEC-005","type":"accountable-to","target":"ORG-13","description":"This actor owns the recorded reference disposition.","sources":["BRIEF-C"],"provenance":"documented","confidence":"high"},{"id":"REL-169","source":"DEC-005","type":"constrains","target":"R2","description":"Authorize R2 design/readiness investigation only. Require customer-value investigation; prohibit twelve-branch activation and retain procurement deferral.","sources":["BRIEF-C"],"provenance":"documented","confidence":"high"},{"id":"REL-170","source":"C-130","type":"supplies-signal-to","target":"C-110","description":"Qualified people, available time, geography, and capacity inform promise feasibility. This is a dependency, not proof of causal contribution.","sources":["BRIEF-A"],"provenance":"inferred","confidence":"medium"},{"id":"REL-171","source":"C-140","type":"supplies-signal-to","target":"C-110","description":"Usable part-status evidence is a prerequisite for the normal promise path.","sources":["BRIEF-A"],"provenance":"inferred","confidence":"medium"},{"id":"REL-172","source":"C-110","type":"manages","target":"BO-02","description":"The capability governs the commitment and its changes.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-173","source":"C-140","type":"manages","target":"BO-05","description":"Part availability includes reservation, release, expiry, and consumption.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-174","source":"C-130","type":"manages","target":"BO-06","description":"Scheduling governs assignment of qualified people to authorized work.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-175","source":"R1","type":"changes","target":"C-110","description":"The accepted R1 reference design changes this ability within the three-branch boundary; this does not assert achieved improvement.","sources":["BRIEF-A","BRIEF-B"],"provenance":"inferred","confidence":"medium"},{"id":"REL-176","source":"R1","type":"changes","target":"C-130","description":"The accepted R1 reference design changes this ability within the three-branch boundary; this does not assert achieved improvement.","sources":["BRIEF-A","BRIEF-B"],"provenance":"inferred","confidence":"medium"},{"id":"REL-177","source":"R1","type":"changes","target":"C-140","description":"The accepted R1 reference design changes this ability within the three-branch boundary; this does not assert achieved improvement.","sources":["BRIEF-A","BRIEF-B"],"provenance":"inferred","confidence":"medium"},{"id":"REL-178","source":"R1","type":"changes","target":"C-170","description":"The accepted R1 reference design changes this ability within the three-branch boundary; this does not assert achieved improvement.","sources":["BRIEF-A","BRIEF-B"],"provenance":"inferred","confidence":"medium"},{"id":"REL-179","source":"R1","type":"changes","target":"C-180","description":"The accepted R1 reference design changes this ability within the three-branch boundary; this does not assert achieved improvement.","sources":["BRIEF-A","BRIEF-B"],"provenance":"inferred","confidence":"medium"},{"id":"REL-180","source":"I-01","type":"contains","target":"R1","description":"R1 is the bounded feasibility release within Connected Service Promise.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-181","source":"I-01","type":"contains","target":"R2","description":"R2 is a possible repeatability release; only design/readiness is authorized.","sources":["CASE","BRIEF-C"],"provenance":"documented","confidence":"high"},{"id":"REL-182","source":"I-01","type":"supports","target":"O-01","description":"The initiative must be evaluated against this objective and its guardrails.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-183","source":"I-01","type":"supports","target":"O-02","description":"The initiative must be evaluated against this objective and its guardrails.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-184","source":"I-01","type":"supports","target":"O-03","description":"The initiative must be evaluated against this objective and its guardrails.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-185","source":"R1","type":"depends-on","target":"POL-01","description":"Readiness requires accepted confirmation, exception, revision, and recovery rules.","sources":["B"],"provenance":"documented","confidence":"high"},{"id":"REL-186","source":"C-110","type":"governed-by","target":"POL-01","description":"The normal and exception promise paths are governed by POL-01.","sources":["B"],"provenance":"documented","confidence":"high"},{"id":"REL-187","source":"BO-05","type":"represents","target":"SYS-RESERVATION","description":"The concept is represented in a provisional R1 record. The concept and record are not interchangeable.","sources":["B"],"provenance":"documented","confidence":"high","label":"is represented in"},{"id":"REL-188","source":"BO-02","type":"represents","target":"SYS-PROMISE","description":"The commitment is represented in the R1 record with original/revised lineage.","sources":["B"],"provenance":"documented","confidence":"high","label":"is represented in"},{"id":"REL-189","source":"R2","type":"depends-on","target":"BO-05","description":"OI-06 requires enterprise source authority before R2 activation.","sources":["BRIEF-C"],"provenance":"documented","confidence":"high"},{"id":"REL-190","source":"R2","type":"depends-on","target":"ORG-05","description":"Regional exception capacity must be resolved before activation.","sources":["BRIEF-C"],"provenance":"documented","confidence":"high"},{"id":"REL-191","source":"A4","type":"changes","target":"C-110","description":"Illustrative impact of the documented feed/queue option: validate this scope if the option is selected.","sources":["A"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-192","source":"A4","type":"changes","target":"C-130","description":"Illustrative impact of the documented feed/queue option: validate this scope if the option is selected.","sources":["A"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-193","source":"A4","type":"changes","target":"C-140","description":"Illustrative impact of the documented feed/queue option: validate this scope if the option is selected.","sources":["A"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-194","source":"A4","type":"depends-on","target":"BO-05","description":"The narrow feed assumes reliable reservation identifiers and source-state semantics.","sources":["A","B"],"provenance":"documented","confidence":"high"},{"id":"REL-195","source":"A4","type":"depends-on","target":"BO-06","description":"A usable skill/assignment signal is required for the proposed feed.","sources":["A"],"provenance":"documented","confidence":"high"},{"id":"REL-196","source":"A4","type":"uses","target":"SYS-RESERVATION","description":"Illustrative design extension: assess the existing record as an input; source fitness remains open.","sources":["A","B"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-197","source":"A0","type":"changes","target":"C-170","description":"Reporting reconciliation targets definitions and comparable evidence.","sources":["A"],"provenance":"inferred","confidence":"medium"},{"id":"REL-198","source":"A3","type":"changes","target":"C-110","description":"Illustrative footprint of the proposed platform; final business scope and benefit have not been established.","sources":["A"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-199","source":"A3","type":"changes","target":"C-130","description":"Illustrative footprint of the proposed platform; final business scope and benefit have not been established.","sources":["A"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-200","source":"A3","type":"changes","target":"C-140","description":"Illustrative footprint of the proposed platform; final business scope and benefit have not been established.","sources":["A"],"provenance":"illustrative","confidence":"medium"},{"id":"REL-201","source":"A3","type":"depends-on","target":"BO-05","description":"A platform still needs reliable reservation meaning and source quality.","sources":["A"],"provenance":"inferred","confidence":"medium"},{"id":"REL-202","source":"I-01","type":"contains","target":"CP-01","description":"Change package defined within the original Connected Service Promise scope.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-203","source":"CP-01","type":"changes","target":"C-110","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-204","source":"CP-01","type":"changes","target":"C-180","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-205","source":"I-01","type":"contains","target":"CP-02","description":"Change package defined within the original Connected Service Promise scope.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-206","source":"CP-02","type":"changes","target":"C-140","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-207","source":"CP-02","type":"changes","target":"C-130","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-208","source":"CP-02","type":"changes","target":"C-180","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-209","source":"I-01","type":"contains","target":"CP-03","description":"Change package defined within the original Connected Service Promise scope.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-210","source":"CP-03","type":"changes","target":"C-110","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-211","source":"CP-03","type":"changes","target":"C-130","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-212","source":"I-01","type":"contains","target":"CP-04","description":"Change package defined within the original Connected Service Promise scope.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-213","source":"CP-04","type":"changes","target":"C-110","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-214","source":"CP-04","type":"changes","target":"C-170","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-215","source":"I-01","type":"contains","target":"CP-05","description":"Change package defined within the original Connected Service Promise scope.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-216","source":"CP-05","type":"changes","target":"C-170","description":"Decision-focused capability impact derived from the documented package outcome; verify during scope review.","sources":["ROADMAP"],"provenance":"inferred","confidence":"medium"},{"id":"REL-217","source":"CP-03","type":"depends-on","target":"CP-01","description":"The workbook’s package sequence identifies this hard dependency.","sources":["ROADMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-218","source":"CP-04","type":"depends-on","target":"CP-01","description":"The workbook’s package sequence identifies this hard dependency.","sources":["ROADMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-219","source":"CP-04","type":"depends-on","target":"CP-02","description":"The workbook’s package sequence identifies this hard dependency.","sources":["ROADMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-220","source":"CP-04","type":"depends-on","target":"CP-03","description":"The workbook’s package sequence identifies this hard dependency.","sources":["ROADMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-221","source":"CP-05","type":"depends-on","target":"CP-04","description":"The workbook’s package sequence identifies this hard dependency.","sources":["ROADMAP"],"provenance":"documented","confidence":"high"},{"id":"REL-222","source":"ORG-02","type":"contributes-to","target":"C-110","description":"Contribution and rights follow the detailed actor and organization-contribution tables; this is not a reassignment of accountability.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-223","source":"ORG-05","type":"contributes-to","target":"C-130","description":"Contribution and rights follow the detailed actor and organization-contribution tables; this is not a reassignment of accountability.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-224","source":"ORG-05","type":"contributes-to","target":"C-110","description":"Contribution and rights follow the detailed actor and organization-contribution tables; this is not a reassignment of accountability.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-225","source":"ORG-03","type":"contributes-to","target":"ST-02","description":"Contribution and rights follow the detailed actor and organization-contribution tables; this is not a reassignment of accountability.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-226","source":"ORG-04","type":"contributes-to","target":"ST-04","description":"Contribution and rights follow the detailed actor and organization-contribution tables; this is not a reassignment of accountability.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-227","source":"ORG-01","type":"contributes-to","target":"ST-05","description":"Contribution and rights follow the detailed actor and organization-contribution tables; this is not a reassignment of accountability.","sources":["CASE"],"provenance":"documented","confidence":"high"},{"id":"REL-228","source":"C-170","type":"measured-by","target":"M-01","description":"This measure helps evaluate the practice; it is not a standalone score for the entire capability.","sources":["B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-229","source":"C-170","type":"measured-by","target":"M-04","description":"This measure helps evaluate the practice; it is not a standalone score for the entire capability.","sources":["B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-230","source":"C-170","type":"measured-by","target":"M-07","description":"This measure helps evaluate the practice; it is not a standalone score for the entire capability.","sources":["B","C"],"provenance":"inferred","confidence":"medium"},{"id":"REL-231","source":"ST-01","type":"uses","target":"BO-01","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-232","source":"ST-02","type":"uses","target":"BO-02","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-233","source":"ST-03","type":"uses","target":"BO-03","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-234","source":"ST-03","type":"uses","target":"BO-05","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-235","source":"ST-03","type":"uses","target":"BO-06","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-236","source":"ST-04","type":"uses","target":"BO-04","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-237","source":"ST-05","type":"uses","target":"BO-02","description":"The stage criteria require this business concept to be understood and evidenced.","sources":["CASE"],"provenance":"inferred","confidence":"medium"},{"id":"REL-238","source":"OUT-03","type":"measured-by","target":"M-ORIGINAL","description":"The v1.2 extension adds this balancing view of customer value.","sources":["C","DATA"],"provenance":"documented","confidence":"high"},{"id":"REL-239","source":"R2","type":"depends-on","target":"M-ORIGINAL","description":"DEC-005 requires investigation of deteriorating customer-value signals before activation.","sources":["BRIEF-C"],"provenance":"documented","confidence":"high"},{"id":"REL-240","source":"OUT-03","type":"measured-by","target":"M-RESTORATION","description":"The v1.2 extension adds this balancing view of customer value.","sources":["C","DATA"],"provenance":"documented","confidence":"high"},{"id":"REL-241","source":"R2","type":"depends-on","target":"M-RESTORATION","description":"DEC-005 requires investigation of deteriorating customer-value signals before activation.","sources":["BRIEF-C"],"provenance":"documented","confidence":"high"}],"journeys":[{"id":"architecture","title":"What is business architecture?","minutes":"5 min","intro":"Follow one customer promise through the enterprise.","steps":[{"title":"Start with the customer’s unfinished work.","body":"The customer operations manager triggers Restore Equipment Availability when equipment is unavailable or at risk. The value proposition is restored usable availability confirmed by that customer. The whole stream contains the stages that create and deliver this value.","view":"value","element":"VS-01","focus":"","prompt":"What tells us the value stream has succeeded?","choices":[{"label":"A technician finishes the visit.","feedback":"The visit can end while recovery is still needed. Inspect the final stage.","correct":false},{"label":"Availability is restored and the customer confirms the outcome.","feedback":"Yes. ST-05 keeps the obligation open during recovery and records unfulfilled termination separately.","correct":true}]},{"title":"An ability is different from the team doing it.","body":"Customer Promise Management describes the ability to govern a commitment. A dispatcher, a policy, and software help realize it. Northstar still needs that ability if the org chart or application changes. Expand its branch to see the finer abilities.","view":"capabilities","element":"C-110","focus":"","prompt":"Would buying a scheduler create a new capability by itself?","choices":[{"label":"Yes; the application is the capability.","feedback":"The application is one possible enabler. The business ability has a wider boundary.","correct":false},{"label":"No; inspect which existing abilities and conditions change.","feedback":"Exactly. Keep the ability stable while investigating its realization.","correct":true}]},{"title":"Many abilities deliver one increment of value.","body":"Define service promise is a stage, not the whole stream. It delivers the value item “A credible commitment accepted by the customer.” That contribution accrues with the other stages’ value items toward restored availability. Promise governance, qualified capacity, parts, and shared definitions enable it.","view":"value","element":"ST-02","focus":"","prompt":"Why does one capability appear under several stages?","choices":[{"label":"The map accidentally duplicates the capability.","feedback":"The same stable capability can contribute at multiple stages; it is not a new capability each time.","correct":false},{"label":"The enterprise reuses an ability across value delivery.","feedback":"Yes. Stage contributions are cross-mappings, not capability parent/child relationships.","correct":true}]},{"title":"Meaning and authority make the map operational.","body":"“Allocated” sometimes means only a planning quantity. Supply owns the reservation concept; Information Governance helps govern shared meaning. Neither fact makes every screen enterprise-authoritative.","view":"information","element":"BO-05","focus":"","prompt":"What must be checked before trusting the record?","choices":[{"label":"Owner, meaning, lifecycle, source freshness, and accepted scope.","feedback":"Right. E-008 accepts a provisional R1 source with twice-daily reconciliation.","correct":true},{"label":"Only which database has the field.","feedback":"A physical location does not settle the business meaning or permitted use.","correct":false}]},{"title":"Use architecture to ask for better evidence.","body":"Strategy connects to intended outcomes, capability changes, initiatives, and measures. Those connections expose what an investment depends on. They do not calculate its return.","view":"strategy","element":"O-01","focus":"","prompt":"What is a sound use of this trace?","choices":[{"label":"Rank investments solely by the number of links.","feedback":"More connections do not establish value, cost, causation, or priority.","correct":false},{"label":"Test dependencies and evidence with the decision owners.","feedback":"Yes. The result should be a better bounded decision, with unresolved claims visible.","correct":true}]}]},{"id":"diagnose","title":"Why is Northstar missing its objective?","minutes":"5 min","intro":"Investigate the gap without jumping to a software answer.","steps":[{"title":"The headline is a starting question.","body":"The executive target is 95% adherence by 2027. The reported 82% enterprise baseline combines incompatible regional definitions. It signals a problem but is not a reconciled pilot baseline.","view":"strategy","element":"M-01","focus":"","prompt":"Can we subtract 82% from the pilot result and claim the improvement?","choices":[{"label":"Yes, both are adherence percentages.","feedback":"The populations, periods, and promise definitions differ.","correct":false},{"label":"No, reconcile definitions and cohorts first.","feedback":"Correct. Comparable meaning comes before a persuasive comparison.","correct":true}]},{"title":"Find the dependency behind the promise.","body":"A dispatcher can commit a date before part status, skill, travel, and capacity are dependable. Explore one hop from promise management. Which dependency would you inspect first, and what evidence would change your view?","view":"relationships","element":"C-110","focus":"","prompt":"Does the relationship map establish the dominant cause?","choices":[{"label":"No; it identifies competing explanations to investigate.","feedback":"Yes. E-003 supports plausible constraints, not their relative causal contributions.","correct":true},{"label":"Yes; the most connected capability is the cause.","feedback":"Connection count is not causal evidence.","correct":false}]},{"title":"A precise word can still carry an imprecise promise.","body":"The diagnostic found delayed reservation updates and uses of “allocated” that did not mean confirmed. The 24 inspected sequences were purposively selected.","view":"information","element":"BO-05","focus":"","prompt":"What can we conclude?","choices":[{"label":"The enterprise defect rate is 7 out of 24.","feedback":"That sample does not justify an enterprise prevalence estimate.","correct":false},{"label":"A semantic/control defect exists in the inspected work.","feedback":"Yes. Now investigate its materiality and whether a faster feed would preserve the ambiguity.","correct":true}]},{"title":"The better dashboard raises a harder question.","body":"At day 90, cumulative latest-promise adherence is 451/486. Within retained scope, original fulfillment falls from 87.7% to 78.4%, while mean restoration time rises from 40 to 48 hours. Inspect the different periods.","view":"strategy","element":"M-ORIGINAL","focus":"","prompt":"What does this justify?","choices":[{"label":"Investigate customer value and limit expansion.","feedback":"Correct. Deterioration warrants investigation, without claiming the policy caused it.","correct":true},{"label":"Declare either proven success or proven harm.","feedback":"Neither causal conclusion follows from these descriptive comparisons.","correct":false}]}]},{"id":"invest","title":"Where should Northstar invest?","minutes":"6 min","intro":"Compare commitments by what they can establish.","steps":[{"title":"The expensive option is easy to name.","body":"The vendor demonstration establishes a technical behavior. The $4–7m platform option still lacks evidence of enterprise fit, adoption, and customer value.","view":"impact","element":"A3","focus":"A3","prompt":"What would strengthen a platform case?","choices":[{"label":"Verified residual gaps, comparable options, and a separate business case.","feedback":"Yes. A feature demonstration alone cannot make that argument.","correct":true},{"label":"The vendor can draw a complete architecture diagram.","feedback":"Completeness of a diagram does not establish the value of the intervention.","correct":false}]},{"title":"Give the smaller rival a fair hearing.","body":"A4 proposes a $60–120k feed and exception queue. It may win if source states are reliable and avoidable checking delay is the material constraint. Compare its footprint with R1.","view":"impact","element":"A4","focus":"A4","prompt":"When could the narrow integration be preferable?","choices":[{"label":"Whenever it costs less.","feedback":"A cheaper response that misses the limiting condition is not necessarily better.","correct":false},{"label":"When verified source quality and a measured bottleneck support it.","feedback":"Exactly. Check the business dependency before comparing the price.","correct":true}]},{"title":"Buy the fact that could change the decision.","body":"The reference path initially releases only $15k for diagnosis inside a conditional envelope. Preparation and activation each require later decisions. The whole cap is not automatically released.","view":"strategy","element":"DEC-001","focus":"","prompt":"What makes the diagnostic worth funding?","choices":[{"label":"It is guaranteed to validate the preferred pilot.","feedback":"A useful diagnostic may favor A0, A4, redesign, or stopping.","correct":false},{"label":"Its possible findings can change the next commitment.","feedback":"Yes. A learning exercise that cannot alter a decision needs redesign.","correct":true}]},{"title":"Funding and readiness answer different questions.","body":"Training, baseline reconciliation, provisional source controls, exception authority, support, and rollback must work in the actual operation.","view":"information","element":"ORG-15","focus":"","prompt":"Can the readiness forum activate twelve branches?","choices":[{"label":"No; its authority is bounded to R1.","feedback":"Correct. R2 activation and procurement remain with separate Investment Council decisions.","correct":true},{"label":"Yes, because the initiative already has funding.","feedback":"A funding envelope does not enlarge delegated operating authority.","correct":false}]},{"title":"A feasible practice can still be a poor expansion.","body":"The day-90 reference decision allows R2 design/readiness only. Customer-value concerns, rural performance, recurring manual burden, and source authority remain unresolved.","view":"strategy","element":"DEC-005","focus":"","prompt":"Which next action respects the evidence?","choices":[{"label":"Investigate the residual gaps and preserve a stop option.","feedback":"Yes. The architecture keeps the alternatives, conditions, and responsible parties connected.","correct":true},{"label":"Automatically scale after crossing 92%.","feedback":"That is an interim feasibility threshold, not proof of customer value or permission to expand.","correct":false}]}]},{"id":"modernize","title":"What changes if we modernize this capability?","minutes":"4 min","intro":"Test a fictional integration choice against real case dependencies.","steps":[{"title":"Take A4 as a possibility, not an approval.","body":"Suppose Northstar selects the documented targeted integration option. Its detailed footprint here is an explicitly illustrative extension. Open a path to see where the inference begins.","view":"impact","element":"A4","focus":"A4","prompt":"Does the highlighted footprint authorize implementation?","choices":[{"label":"No; it scopes questions and stakeholders for review.","feedback":"Correct. The initiative remains a candidate, and indirect impacts remain inferred.","correct":true},{"label":"Yes; every highlighted item is a confirmed requirement.","feedback":"An impact map is not an approved requirement set.","correct":false}]},{"title":"A faster signal needs a sound meaning.","body":"Follow the proposed feed to the reservation concept and its provisional record. A confirmed reservation may expire; an allocated planning quantity may not be physically held.","view":"relationships","element":"BO-05","focus":"","prompt":"What is the prerequisite for safe automation?","choices":[{"label":"Publish every available status as quickly as possible.","feedback":"That could propagate ambiguity faster.","correct":false},{"label":"Validate state meaning, freshness, lineage, and failure handling.","feedback":"Yes. The dependency can require information and operating work before technical work.","correct":true}]},{"title":"Find the people who must make it work.","body":"Supply owns part performance and reservation meaning. Field Service owns scheduling performance; Regional Operations contributes cross-branch capacity and exception authority. Inspect those distinct links.","view":"information","element":"C-130","focus":"","prompt":"Who should resolve cross-branch exception capacity?","choices":[{"label":"Regional Operations with the relevant operating owners.","feedback":"Yes. Information stewardship and technical integration do not replace this operating authority.","correct":true},{"label":"The business architect acting alone.","feedback":"The architect can frame and trace the issue but cannot assume operating authority.","correct":false}]},{"title":"Define what would count as better.","body":"Measure effort and exception delay while preserving original commitments, restored availability, margin, and capacity. If integration improves a screen but worsens the customer outcome, revisit the design.","view":"strategy","element":"M-RESTORATION","focus":"","prompt":"Which evidence would justify continuing?","choices":[{"label":"A faster API response by itself.","feedback":"Technical performance does not settle the business outcome.","correct":false},{"label":"Verified operational improvement with acceptable customer outcomes and guardrails.","feedback":"Yes. Keep the measures and stop conditions connected to the intended value.","correct":true}]}]}]}